Description
All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 78 DAYS Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work. Your quote should include the following information: ***************QUOTE AMOUNT AND RTAT *************** o Unit Price:__________ o Total Price:__________ o Repair Turnaround Time (RTAT): _______ days o Number of Days Quote is Valid (ideally 60 days or longer): ________ Days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. *Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___ *Return Material Authorization # (RMA), if applicable:__________ *Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________________ ***************TESTING AND EVALUATION IF BEYOND REPAIR*************** * T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR, the contracting officer will negotiate a reduced contract price, not-to exceed (NTE) $___________associated with the repair effort to reflect the BR status of the equipment. * The T&E fee (if asset is determined BR/BER) was determined/computed based on:______________________________________. ***************AWARDEE INFO & PERFORMANCE LOCATION*************** o Awardee CAGE: __________ *Inspection & Acceptance CAGE, if not same as "awardee CAGE": __________ * Facility/Subcontractor CAGE (where the asset should be shipped), if not same as "awardee CAGE":__________ *************** IOT COMPARE REPAIR P…
Classification
Contracting Office
Contacts