Description
Replacement AC Package Units; Solicitation No. 36C24226B0035; Project No. 630A4-26-409 at St. Albans Community Living Center, 179-00 Linden Blvd, Jamaica, NY 11425. The purpose of this amendment is to provide responses to Request for Information (RFI) and Questions, RFIs and Questions responses are hereby included. Additional changes to the Scope of Work are also included. Scope of Work Addition and Remove Highlighted in Red = Removed from Scope of Work Highlighted in Green = Added to Scope of Work Scope of Work: Contractor to provide pretesting, post-testing, balancing and deficiency reports for all replacement / restoration work to verify all work. Contractor to furnish and install lockable local disconnect switches for all installations. Contractor to be responsible for any new duct connections and cleaning of existing ductwork used in HVAC renovations. Contractor to clean and certify all ductwork. Remove and replace the following, one unit per location listed: AHUs serving: Building 87 Chapel Building 88 Commissary Office AC package units serving: Building 89 Floor 2 Pub Outdoor Air-cooled chiller serving: Building 87 Sterile Processing Department (SPD) Outdoor condensers serving: Building 87 Chapel AHU Building 89 Floor 2 Dining Room AC Package Unit Building 89 Floor 2 Pub AC Package Unit Restore and make operational the following, one unit per location listed: AC Package Units serving: Building 64 Boiler Plant Building 85/86 Floors 2 and 3 Building 86 Adult Day Health Care. Building 89 Nutrition and Food Services (NFS) Building 89 Pharmacy Building 89 Pharmacy Storage Building 89 Recreation Service Building 91 Director Conference Room AHUs serving: Building 88 Commissary Office Building 88 Commissary Dom HVAC units located in: Building 64 Boiler Plant Ground Floor Building 64 Boiler Plant Lower Level Install new electric air curtains; contractor to supply power, breakers, and conduit. Remove existing electric air curtains located at: Building 89 Loading Dock Building 89 Main Entrance Install new electric air curtains, MARS Model 96HV-2 or similar, at locations: Building 85 Main Entrance Building 88 Outpatient Clinic Entrance Building 89 Loading Dock Building 89 Main Entrance Performance Period: 365 Calendar Days Responses to RFIs/Questions S.O.W. ITEM 5-a-i Building 64 Boiler Plant . Please provide information. No documentation was made available nor was information available on the walk-through VA Response: Allocation: (16) hours of diagnostics, (16) hours for deficiency report, (40) labor hours, and $10,000 in materials for repairs/restoration based on findings of diagnostics report. S.O.W. ITEM 6-b-i and 6-b-ii Please provide distance(s) to VA electrical sources for NEW air curtains, Bldg. 85 and 88. VA Response: The maximum distance to VA electrical sources for the new air curtains in Buildings 85 and 88 is not to exceed 150 feet. Are the RETURN AIR FANS and EXHAUSTS (which are physically separate from the AHUs on the listed built-up sy…
Classification
Contracting Office
Contacts