Description
Step-One (Technical Evaluation) Solicitation- W58RGZ-26-B-0007 DATE: 16 APR 2026 Product or Service Code: 4320 Contracting Office Address: U.S. Army Aviation and Missile Command (W58RGZ) ATTN: CCAM-AVA-B, Building 5303, Martin Road Redstone Arsenal, AL 35898-5280 (US) SUBJECT: Overhaul, PUMPING UNIT, HYDRAULIC for the (UH-60) Blackhawk TECHNICAL SUBMISSION (STEP-1) SOLICITATION NUMBER: W58RGZ-26-B-0007 RESPONSE DATE: 15 May 2026, 5PM, CST Contracting Officer: Edward A. Peterson, email:edward.a.peterson4.civ@army.mil DESCRIPTION: The contractor shall furnish all labor, facilities, parts, materials, equipment, tools and data (other than Government Furnished Property), necessary to accomplish the overhaul of the following assets: INPUT NSN: 4320-01-147-2150 INPUT P/N: 70652-02950-105 OUTPUT NSN: 4320-01-147-2150 OUTPUT P/N: 70652-02950-105 ESTIMATED QUANTITY RANGE: Minimum 36 each – Maximum 216 each (Maximum includes a Foreign Military Sales (FMS) Quantity of 36 each) The proposed contractual action will be a Five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Maintenance and Overhaul type contract, with minimum/maximum quantities listed above. These items are non- commercial; FAR Part 12 will not be utilized. Required delivery shall be FOB Origin. This procurement will be solicited as a Full and Open competitive requirement. 1. The U.S. Army Contracting Command – Redstone Arsenal (ACC-RSA) will issue an Invitation for Bid (IFB) for the overhaul of the PUMPING UNIT, HYDRAULIC. All work shall be completed in accordance with the Statement of Work (SOW). The Government does not have a Depot Maintenance Work Requirement (DMWR) for the proposed solicitation. The IFB will be issued as a Full and Open Competitive action using the Two-Step Sealed Bidding Method. It is anticipated that a single Firm-fixed Price (FFP) type contract will be awarded to the responsive, responsible bidder. Only bids based upon technical proposals determined to be acceptable, either initially or as a result of discussions, will be considered further for award into Step-Two. Each bid in the second step must be based on the bidder's own technical proposal. Bidders shall submit bids that are acceptable without additional explanation or information. The Government may make a final determination regarding a technical proposal's acceptability solely based on the bid as submitted. The Government may proceed with Step-Two without requesting further information from any bidder. A notice of unacceptability will be forwarded to the Bidder upon completion of the technical proposal evaluation and final determination of unacceptability. This begins the start of step-one technical submission. The technical information (step-one) will be submitted no later than 15 May 2026, 5 PM CST. 2. Technical proposals (Step-One) shall not include prices or pricing information. 3. Bidders shall ensure submission of fully complete bids, including all fill-in-the blanks. Any…
Classification
Contracting Office
Contacts