Description
DESCRIPTION OF SERVICES: GENERAL The Contractor shall provide all labor, equipment, materials, and supervision necessary to furnish, install, and correct cited deficiencies of current MEDICAL GAS (MED-GAS) systems with maintenance/testing requirements to reduce facility risk posture. All work to be completed on the 3rd Floor, Building #1, VA Northern Indiana Health Care Systems, Fort Wayne Campus, 2121 Lake Avenue, Fort Wayne, IN 46805-5100. SCOPE Contractor s work and responsibility shall include all contractor planning, programming, administration, and management necessary to provide all construction and related services as specified. Building #1 s Med-Gas System Evaluation. The Med Gas system has been evaluated in accordance with the applicable edition of NFPA 99 Health Care Facilities Code and ASSE 6000 Standards. The system is within applicable guidelines except as noted in the inspection report. All cited deficiencies for the third floor shall be repaired, replaced, or updated. Area Alarm: Deficiencies: There is no area alarm panel supporting Recovery Room #3204. Correction: Furnish & install new area alarm panel supporting at minimum O (OXYGEN), MA (COMPRESS MEDICAL AIR), VAC (MEDICAL VACUUM). Installation shall be for Recovery Room #3204, including all transducers, wiring, labeling; verify setpoints and functional test (audible/visual, test mode, signal accuracy). The Contractor shall perform alarm setpoint and full functional test (including audible/visual alarm activation, test mode operation, and signal accuracy verification). Verification of setpoint documentation and panel labeling check. A qualified ASSE 6030 medical vacuum verifier shall perform final verification and certification of all affected systems. The Contractor shall retain verifier, complete all corrections, and furnish updated certification. Warranty. The Contractor shall provide a minimum one year warranty on parts, labor, and installation workmanship. Zone Valve Boxes: Deficiencies: There is no intervening wall between zone valves and outlets/inlets served in Room #3315 and Room #3304; PRE-OPERATION ROOM (PRE OP). Each room contains three (3) affected valves (O , MA, VAC) for a total of six (6) valves. Correction: Relocate zone valve boxes to a compliant location not served by the valves or modify architectural layout to provide a required intervening wall. All location shall be verified and approved by COR. Update all valve labeling accordingly. Furnish and install all necessary materials, piping, enclosures, fittings, labeling, supports, and accessories to complete valve box relocation. Per NFPA 99, all station outlets/inlets shall be supplied through a zone valve meeting the following requirements: The zone valve shall be placed such that a wall intervenes between the valve and outlets/inlets that it controls. The zone valve shall serve only outlets/inlets located on that same story. The zone valve shall not be located in a room with station outlets/inlets that…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)