Description
This is a combined synopsis/solicitation for commercial products prepared in accordance with FAR Part 12, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued. USCG Base Ketchikan has a requirement to procure one (1) new, complete high-security hollow metal door and frame assembly, in accordance with the Description/Specifications detailed herein. CLIN 0001 – High-Security Hollow Metal Door, Frame, and Hardware Assembly – 1 Each Section C: Description/Specifications C.1 SCOPE OF REQUIREMENT The contractor shall provide one (1) complete, new, and fully operational high-security hollow metal door and frame assembly. The requirement includes the door, frame, and all associated and compatible hardware necessary to meet the performance and security standards detailed in this document. C.2 APPLICABLE DOCUMENTS COMDTINST M5530.1C Federal Specification FF-L-2890 UL-634 ANSI/BHMA A156.4 C.3 MINIMUM SALIENT CHARACTERISTICS The complete assembly must meet or exceed the following minimum characteristics: C.3.1 Door and Frame: Hollow Metal (HM) Door and a two-piece "Split" Frame for a 3'0" x 7'0" (3070) opening in a 7-3/4" thick wall; Right Hand (RH) swing; Factory-primed. C.3.2 Performance Ratings: Acoustic: Certified STC rating of 52 or higher . Radio Frequency: Certified 60 decibels (dB) or greater of RF attenuation. Certification: Offeror must provide independent lab certifications with their quote to prove compliance. C.3.3 Hardware Requirements: Lock: GSA-approved lock meeting FF-L-2890 with a 1/8-inch drill-resistant hard plate . Closer: Heavy-duty closer meeting ANSI/BHMA A156.4 Grade 1 , factory-installed. Hinges, Egress, Seals: Heavy-duty non-removable pin hinges, a compatible single-motion egress device, and a complete set of acoustic/RF seals and threshold. C.3.4 IDS & Wiring Preparation: Factory-prepped with an internal wire raceway and an Armored or Electronic Power Transfer (EPT) device. Factory-prepped to accept a Government-installed UL-634, Level 2 High Security Switch (HSS) . Section E: Inspection and Acceptance Acceptance will be performed at destination and is contingent upon verification of all components, receipt of all required STC/RF certifications, and visual inspection confirming items are free of damage. Section F: Deliveries or Performance Shop Drawings: Shall be delivered for Government review within 5 business days of contract award. Final Delivery: Shall occur within 14-16 weeks after Government approval of shop drawings. Shipping: All items shall be delivered FOB Destination to: USCG Base Ketchikan, 1300 Stedman St. Ketchikan, AK 99901. Evaluation—Commercial Products and Commercial Services, applies to this acquisition. The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitatio…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (2)