Description
The contractor shall provide all personnel, equipment, tools, materials, supervision and all other items or services necessary to perform the requirements as described in this Statement of Work (SOW) at JBSA Lackland, Kelly Airfield, TX. Replace the raised lights/signs after the B-52 taxis or is towed to the runway as defined in this SOW. Contractor shall be responsible for ensuring the B-52 has access to Boeing from the runway and ensure the lights/signs are restored back to original condition. The runway and taxiway lights and signs, as described in this SOW, are included in this contract. Attachment 1 - BPA B52 Runway Lighting SOW 11 May 26 Attachment 2 - SCA WD 2015-5253 Rev 29 - 30 Apr 26 Attachment 3 - PoSA Runway - Taxiway Lights and Signage Attachment 4 - Schedule B B-52 CERP Airfield Lighting BPA Price List Questions Due: Tuesday, 19 May 2026, 11:00 AM, CDT Proposal Due: Tuesday, 26 May 2026 at 11:00 AM, CDT
Classification
Place of Performance
Contracting Office
Contacts
Attachments (5)