Description
1. GENERAL INFORMATIONThe U.S. Army Corps of Engineers, Sacramento District (USACE SPK), intends to solicit proposals for a Single Award Task Order Contract (SATOC) to support the renovation, modernization, and phased replacement of plating shop facilities at Hill Air Force Base (HAFB), Utah. This notice is issued for planning and information purposes only and does not constitute a solicitation.The SATOC will be structured as a four (4) phase phased SATOC, with task order execution sequenced to align with operational constraints, funding availability, and mission continuity requirements. The SATOC will have an ordering period of 1,825 calendar days (five (5) years) from the date of contract award. The first task order awarded under the SATOC will satisfy the minimum guarantee.This notice does not constitute a Request for Proposal (RFP), Request for Quotation (RFQ), Invitation for Bids (IFB), or a promise to issue solicitation in the future. This notice does not commit the Government to contract for any supply or service whatsoever. The information provided in this notice is subject to change and is not binding on the Government.2. SCOPE OF WORK (OVERVIEW)The SATOC will support design-bid-build construction task orders for renovation and modernization of plating shop facilities, including but not limited to Buildings 505 and 507 and associated infrastructure at HAFB. Anticipated work includes:? Demolition and replacement of existing plating line tanks and process equipment? Installation and commissioning of new electroplating, anodizing, cleaning, stripping, and surface treatment process lines? Installation of chemical distribution and storage systems? Mechanical, electrical, and control system upgrades supporting plating operations? Ventilation, air quality management, and environmental control systems? Fire suppression and life safety system upgrades? Structural modifications to support new process equipment? Construction of a new approximately 2,800-square-foot Pre-Engineered Metal Building (PEMB) to house relocated ovens and supporting equipment? Utility upgrades including process piping, compressed air, gases, power distribution, and controls? Phased construction to ensure continuous mission operations during renovation? Compliance with environmental, safety, and regulatory requirements applicable to plating operationsIndividual task orders may vary in size, complexity, and duration. Task orders are expected to range from $2,500 to $40 million, with multiple task orders issued over the life of the contract.3. TECHNICAL COMPLEXITY AND RISKThe work involves highly specialized industrial construction within an active operational environment. Successful performance requires demonstrated experience with:? Industrial process facility renovation? Plating shop or similar hazardous material process environments? Precision installation and alignment of tanks and process equipment? Integration of mechanical, electrical, instrumentation, and control syst…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (3)