Description
Administrative correction of SAM system Updated Date Offers Due field to 11 June 2026 to match written Amendment 1 text due date and time. Amendment 1: This amendment incorporates the following changes: Combined Synopsis/Solicitation, offer date changed to 11 June 2026 Incorporates Attachment 9, Responses to Requests for Information. Attachment 1 Solicitation Provisions and Clauses is replaced entirely with the correct text. The synopsis/solicitation text was inadvertently included in the attachment originally. Attachment 2 PWS is revised. Track Changes is used to facilitate identification of changes. Attachment 3 IDIQ Price Matrix – is revised Sample Task Order 1 Attachment 4A and 4B are revised to remove the Auditorium portion of the requirement. Attachment 4B is revised to include a “Note 2” for clarity. Attachment 4A is unchanged. Sample Task Order 2 Attachment 5B is revised to include a “Note 2” for clarity. Attachment 5A is unchanged. Sample Task Order 3 Attachment 6B is revised to include a “Note 2” for clarity. Certain erroneous quantities are corrected, and the type of furniture identified is changed. Attachment 6A is unchanged. Attachment 7 PPQ is unchanged Attachment 8 is changed to read: Addenda to RFO 52.212-1 & 52.212-2 Attachments 10 & 11 Wage Determinations are added. Combined Synopsis/Solicitation (Rev 1) 6 CONS/PKM MacDill Air Force Base, FL, 33261-5119 Date: 4 May 2026 (Revised 20 May 2026) Title: FY26 Flooring Installation Services IDIQ, MacDill AFB/Avon Park Range Request for Quote (RFQ) / Solicitation Number: FA481426Q0014 (See full desription in RFO Combined Synopsis-Solicitation) Quotes Due: 11 June 2026 at 12:00 PM EST Contact Point(s): SSgt Thomas Grove, Contract Specialist, Email: Thomas.Grove.1@us.af.mil Contact Point(s): Lt Ljuan Benbow, Contracting Officer, Email: Ljuan.Benbow.1@us.af.mil 1. Description: The Government intends to award a single IDIQ flooring replacement and installation services with a ceiling value of $9,000.000. Flooring installation is normally for the replacement of existing flooring of the same or a different type, but could include an initial flooring installation. The contractor shall provide all materials for each project including, but not limited to, carpet, vinyl composition tile (VCT), luxury vinyl plank (LVP), luxury vinyl tile (LVT), rubber flooring, adhesives, rubber cove base and adhesives, ceramic / porcelain / quarry tile and adhesives, grout, seam sealers, floor patch, transition strips, wood base sealers and finishes, and fastening hardware. Additionally, the contractor shall provide all equipment, tools, labor, transportation, and off-base storage required to perform the work. For task orders requiring installation of carpet, the contractor will be required to source from the Air Fo…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (23)