Description
Amendment 0003 is hereby issued to incorporate Amendment 0003 is issued to incorporate the Government's consolidated responses to vendor questions and to provide a revised Statement of Work. During the solicitation period, vendors submitted technical and administrative questions following the site visit. The Government reviewed these inquiries and determined that certain clarifications and updates to the Statement of Work were appropriate to ensure all offerors have a common understanding of the requirements. Amendment 0002 is hereby issued to extend the solicitation due date to May 1, 2026. A revised Statement of Work and the Government's consolidated responses to vendor questions will be issued under a subsequent amendment. Amendment 0001 is hereby issued to incorporate the following into Request for Quotation 15BBNF26Q00000038: 1) Incorporate Pre-Quotation Site Visit Meeting Minutes and Sign-In Sheet (see attached). 2) Incorporate photos taken at Pre-Quotation Site Visit 3) Extend solicitation closing date (due date of offers) to April 10, 2026. Notice of Combined Synopsis/Solicitation This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes only solicitation. Offers are being requested and a separate written solicitation will not be issued. This acquisition IS set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. Solicitation number 15BBNF26Q00000038 is issued as a request for quotation (RFQ), for: The Federal Bureau of Prisons, Field Acquisition Office, intends to issue a solicitation for the following requirement: FCI Englewood requires the complete removal and replacement of the roofing system on the Outside Powerhouse at the Federal Correctional Institution (FCI) Englewood, located at 9595 W. Quincy Avenue, Littleton, CO 80123.The contractor shall furnish all labor, materials, equipment, tools, supervision, and warranties necessary to remove approximately 12,000 square feet of existing roofing down to, but not including, the metal or concrete deck, and to install a new fully adhered TPO roofing system consisting of approximately 11,500 square feet over metal decking and 500 square feet over concrete decking. The work includes all associated roofing components such as insulation, flashings, copings, transitions, drainage slope, gutters, downspouts, sealants, primers, adhesives, substrate materials, penetration seals, fasteners, fiberboard, gypsum board, termination bars, sheet metal, vapor protection, and walkway protection around roof access points, HVAC units, security equipment, and roof edges. All work shall comply with the manufacturer's most current specifications, applicable codes, and all requirements contained in Divisions 01, 02, and 07 of the project specifications. The contractor shall …
Classification
Place of Performance
Contracting Office
Contacts