Description
CONTACT INFORMATION|4|N733.06|N00383|2156971323|CHELSEA.J.THOMAS5.CIV@US.NAVY.MIL| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORTS (COMBO)||N/A|N00383|N/A|N/A|N/A|N/A||||||||| 1. This amendment hereby decreases the QTYs of the below PDs: N0038324U0795: The QTY is hereby decreased by QTY 10; from QTY 13 to QTY 3. N0038324U4371: The QTY is hereby decreased by QTY 8; from QTY 8 to QTY 0. 2. All other terms and conditions remain unchanged. \ N0038324U0795 IS HEREBY DECREASED BY 35 UNITS FROM 48 UNITS TO 13 UNITS. N0038324U4371 IS HEREBY DECREASED BY 60 UNITS FROM 65 UNITS TO 5 UNITS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. This requirement is hereby decreased by 32 units from 227 to 195. 1. This requirement is hereby increased by 130 from 97 to 227. \ This is a repair requirement. All terms and conditions of BOA N0038321GYN01 apply. 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 1.5 . Markings shall be in accordance with MIL-STD-130. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An over…
Classification
Contracting Office
Contacts