Description
Mass Parking Apron Repair. This project is located at Minot AFB, North Dakota. This is a Fully-Designed Project. Project will include the following: Remove approximately 53,000 Square Yards of PCC pavement varying in thickness between 15 inches and 18 inches and replace with approximately 55,200 SY of 18-inch PCC pavement and 9,600 SY of 12-inch PCC. New PCC pavement shall conform to 32 13 14.13 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY PAVEMENTS with very stringent fine and coarse aggregate deleterious materials limits unique to military airfield pavement construction, weather severity classification of severe, enforcement of evaluation and testing for Alkali-Silica Reactivity per UFGS 32 13 14.13 requirements for both fine and coarse aggregates, Air Force durability requirement that aggregate shall have a satisfactory service record in freezing and thawing of at least 5 years successful service in three concrete paving projects or aggregate with durability factor of 50 or more when subjected to freezing and thawing of specimens prepared in accordance with ASTM C 1646/C 1646M and tested in accordance with ASTM C 666/C 666M, Procedure A for aggregates not having a satisfactory demonstrable service record. Removal of approximately 10,000 Square Yards of 2-inch hot-mix asphalt pavement, 1,220 square yards of 6.5-inch hot-mix asphalt and replacing 1,800 SY of 6.5-inch hot-mix asphalt pavement conforming to UFGS 32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING; Associated work includes the installation of preformed and poured joint sealant; removal and replacement of cathodic protection test pits; pavement marking; seeding and minor grading.
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)