Description
52000QR260024220 USCGC DAVID DUREN FM200 INSEPECTION The objective of this SOW is to have a certified technician perform on-site diagnostics on the FM200 system for semiannual inspection. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information in this notice. This solicitation is issued as a Request for Quote Number 52000QR260024220 USCGC DAVID DUREN FM200 INSEPECTION This procurement will be processed in accordance with FAR Part 12. The North American Industry Classification System (NAICS) is 423850 - Service Establishment Equipment and Supplies Merchant Wholesalers. This is total small business set aside; all responsible small business sources may submit proposals that will be considered. This synopsis/solicitation is issued pursuant to FAR 13.106-1(b), and the resultant purchase order will be awarded on a firm-fixed price basis using simplified acquisition procedures in accordance with FAR 13. THE UNITED STATED COAST GUARD SURFACE FORCE LOGISTICS CENTER REQUEST THE CONTRACTORS TO PROVIDE PRICING FOR THE FOLLOWING REQUIREMENT: The contractor shall provide 52000QR260024220 USCGC DAVID DUREN FM200 INSEPECTION Statement of Work (SOW) USCGC DAVID DUREN: Pro2000 fire suppression system Background and Current Observed Issues The Pro2000 fire suppression system aboard the USCGC DAVID DUREN is requiring inspection. A qualified technician is required to perform a comprehensive on-site diagnostic inspection. Objectives The objective of this SOW is to have a certified technician perform on-site diagnostics on the FM200 system for semiannual inspection. Scope of Work The Contractor shall provide the services of a certified Tech Rep, who is familiar with the FM 200 fire suppression equipment/system to accomplish the following tasks – on site: Provide manufacturer's proprietary information, software, and tools pertinent to the equipment/system. Assist with proper repair methods, and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system. Ensure that the Tech Rep is a Certified Representative of Chemetron Fire Systems. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed: Wiring Mounting brackets Machinery Prior to accomplishing the below listed tasks, the Contr…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)