Description
This is a combined synopsis/solicitation This is a combined synopsis/solicitation for commercial items/services prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. Request for Quotations number is 70Z085Q024247 and is issued as a request for quotations (RFQ). This announcement constitutes only solicitation; quotations are being requested, and a written solicitation will not be issued. This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-65 dated January 29, 2013. The NAICS Code is 336611. The small business size standard is 1250. This is a totally small business set aside. All responsible sources may submit proposals that will be considered by the agency. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures in accordance with FAR Part 13.5. All responses from interested vendors must be received on/before 0800 Pacific Time, April 30th , 2026, and will be reviewed by the Government. The United States Coast Guard Surface Force Logistics Center has a requirement for the following: Contractor shall provide parts requested for USCGC Bertholf Exhaust repair: General Requirements 1. SCOPE 1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs for Coast Guard vessels performed by commercial contractors at USCG Facilities. 2. REFERENCES COAST GUARD DRAWINGS COAST GUARD PUBLICATIONS Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response OTHER REFERENCES None 3. REQUIREMENTS 3.1 General . The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract. 3.2 Welding and brazing requirements . The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740. 3.3 Fire Prevention . The Contractor must submit a Fire Prevention Plan in accordance with paragraph 3.1 of SFLC Standard Spec 5550. Coordinate with Port Engineer and submit to upon contract award. 3.3.1 Fire Watch . The Coast Guard will provide fire watch personnel and equipment. 3.4 Period of Performance . The period of performance for this work is 1 May 2026 through 30 July 2026. 3.5 Location . The Contractor must perform the work while the USCGC BERTHOLF is alongside the pier…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (2)