Description
The entire paved area at the Memphis Cotton Classing Facility is in a severe state of disrepair and must be replaced. The surfaces were first paved in 1995. There is poor drainage and water intrusion to the subbase, leading to severe degradation. Solicitation documents are posted below. Amendment 1 is posted below. Regarding amendment 1 incorporating pavement striping, acrylic paint is required, and the striping should match existing. RFIs: Can you provide the dimensions of the sink hole that was covered and how you would like to fill it? See photos below for dimensions. Clear the hole, dig out the debris, fill with appropriate material (ie, 3/4 “ gravel), asphalt with back lot. With this being in 3 phases, will the project require 3 mobilizations? Depending on the necessary schedule, yes it may. RFI: Is the intent of this project to preserve as much of the subgrade as possible? Or is the intent to replace the entire subgrade? The intent is to preserve where it can be preserved and replace where necessary to provide a parking area that does not retain water, drains properly, and is appropriately sloped. While at the same time having a finished parking lot that will not deteriorate prematurely due to subgrade preservation. Preserve it to the extent it makes sense to do so. There is no specific requirement to replace it all. Additionally, fog seal is not required.
Classification
Place of Performance
Contracting Office
Contacts