Description
THIS IS A SOURCES SOUGHT NOTICE. THIS NOTICE IS ISSUED FOR MARKET RESEARCH PURPOSES ONLY. THIS IS NOT A SOLICITATION OR INVITATION FOR OFFERORS TO SUBMIT QUOTATIONS. A SYNOPSIS OF PROPOSED CONTRACT ACTION WILL BE POSTED AT A LATER DATE WHICH WILL PROVIDE INSTRUCTIONS FOR OFFERORS TO RESPOND TO THIS OPPORTUNITY. PLEASE DO NOT RESPOND TO THIS NOTICE IF YOU ARE NOT SERIOUSLY INTERESTED AND IF YOU DO NOT PERFORM THIS REQUIREMENT. IT WILL DELAY THE POSTING OF THE SOLICITATION DUE TO FURTHER MARKET RESEARCH THAT WILL BE REQUIRED. The Federal Bureau of Prisons (FBOP) anticipates issuance of a solicitation for the award of a firm-fixed price construction contract for a project entitled Above Ground Storage Tanks, at the Federal Prison Camp (FPC Yankton), located in Yankton, SD. FPC Yankton is located at 1016 Douglas Avenue, Yankton, South Dakota 57078. The project consists of the following: The Federal Bureau of Prisons, FPC Yankton, intends to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to replace an underground fuel tank with an above ground fuel tank and fuel dispensing system at the institution. Work includes notifying the Department of Agriculture and Natural Resources (DANR) 30 days prior to removal, decommissioning the existing fuel dispenser system, and safely isolating and securing the fueling system. The contractor must de-energize and disconnect electrical wiring in compliance with NFPA 70, pump out and dispose of remaining fuel and residues per API RP 1604, and render the 2,500-gallon underground storage tank vapor-free. Demolition also requires excavating and disposing of the old tank, piping, and Gasboy pump, performing a certified site assessment with soil samples, and submitting results to DANR for a closure letter. New work includes backfilling the excavation to 95% standard proctor density, grading for a new tank pad, and installing a 6-inch compacted stone base. The contractor will pour an elevated 6-inch thick, 4000 psi reinforced concrete pad with #4 rebar to support a new horizontal 3,000-gallon split compartment double-wall aboveground storage tank (500 gallons diesel, 2,500 gallons unleaded) that is UL 142 listed. The tank must be anchored and equipped with atmospheric and emergency vents, a level gauge, an anti-siphon valve, ground-level fill with spill containment, continuous leak detection, an overfill prevention valve, an electronic tank gauge with a high-level alarm, a field-mounted driver gauge, and a graduated gauging rod. Additionally, the contractor will install a raised concrete fuel island pad and connect the tank to two new Gasboy 9823K-F Astra (or equal) fuel dispensers featuring pulse output functionality. This includes new UL-listed hoses, breakaways, nozzles, dispenser sumps, and entry boots. The dispensers must be calibrated, tested, and pass a Weights & Measures certification. The system must connect to a new automated fuel tracking syst…
Classification
Place of Performance
Contracting Office
Contacts