Description
The United States Embassy in Baghdad is soliciting proposal of a project to provide Emergency Power off button in the Computer Room (JUCR), Comply with OBO requirements to ensure safety.The United States Embassy in Baghdad is soliciting proposal of a project to provide Emergency Power off button in the Computer Room (JUCR), Comply with OBO requirements to ensure safety. The Statement of Work covers the integration of an Emergency Power Off (EPO) system into an existing electrical and UPS installation. The work is limited to the addition of EPO functionality and associated control wiring, interfaces, and verification activities only. No replacement, relocation, or upgrade of existing UPS units, batteries, or distribution equipment is included, except as required to properly interface the EPO system. The intent of this work is to ensure that activation of a single EPO device results in shutdown of all UPS units and tripping of the main circuit breakers, while preventing stored battery energy from supplying the load, in accordance with NFPA 70 (NEC) Article 645.11.
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)