Description
A market survey is being conducted to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business or Service-Disabled Veteran Owned Small Business and you are interested in this project please respond appropriately. Project Location: Camp Parks Reserve Forces Training Area, CA Project Description: Design Bid Build. The purpose of this project is to provide the Camp Parks Reserve Forces Training Area with a new Collective Training Barracks for Enlisted personnel. This project will provide a 46,000 SF, permanently constructed barracks building to house 300 Soldiers during annual unit training exercises, battle assemblies, major exercises, and pre-mobilization activities. The project will also include a 10,000 SF Fitness Center Annex. The exterior facade will keep to the Fort Hunter Liggett/Parks RFTA Master Plan Design Guide. Building designs will include information systems, fire protection and alarm systems, energy monitoring control systems connection, heating, ventilation, air conditioning, plumbing, and electrical systems. The barracks will consist of open-bay sleeping rooms, gang latrines, storage, team rooms, laundry, restrooms, and shower facilities. The fitness center annex will consist of an open-bay physical fitness area, administrative offices, restrooms, showers, lockers, and storage. Supporting infrastructure for both facilities will include site development, utilities and connections, lighting, paving, walks, curbs/gutters, and storm drainage. An eight-lane regulation outdoor running track will be provided near the barracks. Sustainability/Energy and Cybersecurity measures will be provided. All fixtures, furnishings, and equipment are included. Accessibility for the disabled will be provided. Antiterrorism force protection and physical security measures will be incorporated into the design including maximum standoff distances from roads, parking areas and vehicle unloading areas. Facilities will be designed to a minimum life span of 40 years in accordance with DoD Unified Facilities Criteria 1-200-02 including energy efficiencies, building envelope and integrated building systems performance. Air Conditioning (Estimated 462 kW/131 Tons). Contract duration is estimated at 558 calendar days. The estimated cost range is between $25M and $100M dollars. NAICS code is 236220 . All interested Small Businesses, certified HUBZONE, 8A, Woman-Owned Small Businesses or Service-Disabled Veteran Owned Small Business contractors should respond to this survey via Market Survey Response Form by 10 April 2026 by 1400 Eastern Time . Responses should include: Identification and verification of the company's small business status. Contractor's Unique Entity Identifier (UEI). Documentation from the firm's bonding company showing current single and aggregate performance and payment bond limits. Description of …
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)