Description
Pre-Solicitation Notice Synopsis For W912HN26QA017 – Tampa Harbor Liftboat Charter Services The U.S. Army Corps of Engineers (USACE) Savannah District intends to issue a Request for Quote (RFQ) W912HN26QA017 for Tampa Harbor Lift boat Charter Service. Note: This Synopsis is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming; no quotes are being accepted. The subsequent solicitation will result in a C-Type Stand-alone contract. This Acquisition will be solicited using RFO Part 12. The NAICS Code is 532411 with a size standard of $45.5M. PSC Code: W019 Anticipated Solicitation Release Date: The Government anticipates releasing the solicitation on or about 15 May 2026. Actual dates and times will be identified in the solicitation. Additional details can be found in the solicitation when it is posted. Title of Requirement: Tampa Harbor Lift Boat Charter Service Description of Requirement: The Contractor shall provide a self-propelled lift-vessel capable of operating within 50-feet of water to support drilling operations within the entrance channel of the Tampa Harbor in Tampa Florida. The purpose of using a lift-vessel is to provide a safe, stable, work platform for USACE drilling crews while drilling operations are underway. The lift-vessel shall be fully manned and capable of supporting drilling operations within the entrance channel of Tampa Harbor, FL. The estimated number of days to complete the drilling mission, including weather delays, is 187 days; this does not include the time to mobilize the vessel to Tampa Harbor, FL. The estimated number of days may change depending on customer needs. The Contractor shall also supply a crew boat to transport the drilling crew and any supplemental supplies to and from the lift-vessel; a crane capable of lifting 32,000lbs to load and unload the drill rig and supplies. The Contractor will supply adequate dock space to load and unload necessary supplies and equipment for use in the proposed contract. In addition, the contractor shall provide adequate space to store a pickup truck and semi-tractor and trailer for the duration of the project. The contractor shall be responsible for securing the drilling rig to the vessel using a certified welder. A rod-trough that extends beyond the bow of the vessel shall be constructed to accommodate rod string lay-downs during drilling operations. The contractor shall provide sufficient working area around the drill rig to allow the crew to safely conduct drilling operations; this may require construction of additional deck space. See Appendix 1 for drill rig specifications. Lift-Vessel Requirements. The lift-vessel shall be self-propelled, be capable of jacking up a minimum of 60 feet above the seafloor and have a moon-pool to allow the drill string to be lowered through the deck to the seafloor. Onboard water pump, electrical generation, restrooms and crane capacity is required. The vessel shall be in compliance with established US Coast Guard guidelin…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)