Description
Page 2 of 2 Preserve Charleston Fisher House Project # 534-24-907 Statement of Work Scope The contractor shall provide all supervision, labor, equipment, and materials needed to complete work for project 534-24-907, Preserve Charleston Fisher House located at 150 Wentworth Street, Charleston SC. Work will be accomplished per this Statement of Work and will encompass three parts: Install ADA Ramp Paint Interior Fisher House Paint Exterior Fisher House For part 1 Install ADA Ramp, work will be per the provided construction drawings and specifications of this statement of work. Work will consist of demolition of existing concrete steps and pouring new ADA ramp and steps per the approved Board of Architectural Review Thomas & Denzinger Architects Design and Specifications. For parts 2 and 3 Paint Interior and Exterior, work will require furniture to be moved and protected to access walls, cabinets and ceilings. Painting and caulking of 16 bedroom/bathrooms including crown molding on all 3 floors. Baseboards, window and door trim and at least seven ceilings are required to be painted. Kitchen cabinets are to be repainted, requiring removal of cabinet doors, prepping of surfaces and spray painting. Paint all exterior trim, fascia, soffits, decorative wood columns, porch ceilings, doors, Pergola, and outdoor Pavilion (exterior and interior) and all paintable surfaces of the exterior Fisher House. The following areas are to be scraped, pressure-washed, repaired or replaced, primed, and painted: Doors - Soffit - Fascia - Columns - Pergola Work will need to be done on weekdays between 8:00 a.m and 4:00 p.m at the Fisher House Charleston located at 150 Wentworth Street, Charleston SC. Construction impact shall be minimized and mitigated in a way that limits disruption to the functioning of the Fisher House Charleston. Scheduling and coordination with the Fisher House Charleston will be critical and must be approved by Contracting Officer s Representative (COR) prior to work. General Requirements Employees of the contractor and sub-contractors shall always conduct themselves in a professional manner while on medical center property. The contractor shall ensure all personnel working on this contract are aware of Medical Center policies pertaining to employee behavior and conduct. Physical or verbal misconduct may be grounds for removing employees from Medical Center property, or grounds for arrest by the Veteran Affairs (VA) Police. Employees may be banned from VAHCS property as a result of inappropriate or illegal behavior. The contractor shall not be entitled to any compensation from the Government for any costs resulting from employee misconduct (including, but not limited to, delays in contract completion) and may be held liable for costs incurred by the Government because of employee misconduct. Smoking and vaping is strictly prohibited on the entire VAMC campus. Contract shall furnish maintenance and operating manuals and one compact disc (four hard cop…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)