Description
36C24226B0042 Amendment 1 630A4-17-433 Replace Boiler Plant Main Electrical Switchgear 36C24226B0042 Amendment 1 630A4-17-433 Replace Boiler Plant Main Electrical Switchgear 36C24226B0042 Amendment 1 630A4-17-433 Replace Boiler Plant Main Electrical Switchgear Please confirm the correct Davis-Bacon wage determination. The solicitation currently includes a New York 'Heavy Dredging' wage determination, which appears unrelated to this building electrical project. VA CO: See attachment Please clarify whether bidders are pricing Base Bid only, or Base Bid plus Alternate No. 1. If Alternate No. 1 remains, provide a clear bid schedule. VA COR: Base Bid only Please confirm whether this is strictly design-bid-build. The solicitation references 100% IFC drawings, but the SOW also states the contractor is responsible for the 'design' of replacement systems. VA COR: It s considered design-bid-build. Please provide complete existing equipment data for substations, transformers, MCCs, ATSs, breakers, and feeders (manufacturer, ratings, dimensions, weights, available fault current, trip settings, etc.). VA COR: VA has limited information from its database. GC to conduct full investigation and field verification before work. Please confirm whether existing transformers contain PCBs and provide testing documentation. If unknown, confirm whether an allowance will be issued for hazardous disposal. VA COR: AE shall confirm if the survey was done based on the initial contract. If not, please include service(s) during CPS. Please define allowable outage windows for each shutdown/load transfer, including permitted days, times, duration limits, and blackout periods. VA COR: COR to communicate with St. Albans M&O for shutdown coordination. GC to provide phasing plans and area of work. Please confirm whether shutdowns must occur after hours/weekends and whether premium labor should be included in bids. VA COR: utility shutdown can be performed during normal business hours, depending on location and time. OFF hours work can be established when affecting facility s normal operation. Please identify who is responsible for utility switching/LOTO of the 5kV system (VA staff, utility provider, contractor, or third party). VA COR: Applies to all. Work can be coordinated in between parties, depending on work area and needs. Please confirm whether new short-circuit, coordination, and arc flash studies are required and whether existing studies are available VA COR: Yes, it is required since the contractor shall install a complete new equipment AE shall confirm as well. 18. Please provide hazardous materials survey information for asbestos, lead paint, refrigerants, contaminated oil, and other regulated materials in demolition areas. VA COR: Hazardous sampling and abatement are required. GC to provide abatement service, A/E to provide Air Monitoring service. 20. Please confirm all required permits (NYC DOB, FDNY, utility, environmental, crane permits, etc.) and identify whether the …
Classification
Contracting Office
Contacts