Description
Page 3 of 3 Project No 460-26-010 | Lab and NFS Walk-in Refrigerator Refurbishment Construct Chiller Plant SET-ASDIE 100% FOR SERVICE-DISABLED VETERAN-OWNED BUSINESS ACQUISITION INFORMATION: In accordance with FAR Subpart 5.2 THIS OPPORTUNITY is 100% set-aside for Service-Disabled Veteran-Owned Businesses (SDVOSB) Contractors. This acquisition is conducted in accordance with FAR Part 36 & 14, Invitation for Bid (IFB). Award will be made based on Price only IAW FAR 14 Invitation for Bid procedures. Work to be Performed: -- Services -- PROVIDE: Professional construction services to replace refrigeration system components to ensure reliability, compliance, and operational continuity for the Kitchen, Canteen, and Lab walk-in cold storage units at the Wilmington, Delaware VA Medical Center. -- Project Scope -- GENERAL: The Wilmington, Delaware VA Medical Center operates 4 walk-in refrigerators and 3 freezers in the Kitchen/Canteen, and 1 walk-in refrigerator in the Lab walk-in cold storage units. Systems are showing age-related performance and reliability concerns necessitating assessment and replacement of all system components excluding the walk-in insulated panels. SPECIFICS: The contractor will furnish all materials, equipment, supervision, and personnel necessary to accomplish the project as indicated above. Demolition and replacement of the existing fridge/freezer components shall be included with the exception of the walk-in insulated panels. Removal of current condensing units, evaporators, and line sets. This is not an all-encompassed list. (A crane may be needed for the removal and installation of the condensing units). Installation should include but not limited to new condensing units, evaporators, and line sets for each individual walk-in system. Installation of all necessary electrical controls, including thermostats, defrost controls, fan controls, safety switches, and associated wiring required for the proper operation of each independent refrigeration system. This is not an all-encompassed list. Installation of new door seals on all walk-ins. Contractor shall replace damaged flooring in walk-ins 1328, 1328A, 1330, 1330A, 1314, and 1314A. Contractor shall intergrate the new walk-in controls with our building automation systems to be monitored on the front-end system. Contractor shall remove/add additional condenser pads as required. Contractor shall perform all work during the hours of 7:00 pm 5:30 am. Weekends if necessary. If phasing is required, all work shall be coordinated to minimize disruption to daily functions of the VA campus. Construction activity shall involve all disciplines listed above. All employees of the general contractor and subcontractors shall comply with the VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. The general contractor shall implement the requirements of the VA Infection Control Risk Assessment (ICRA) t…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)