Description
AMENDMENT 02 (2026 May 06/1100 hrs) - the Statement of Work has been updated. Please read it carefully. REMINDER: this is an all-or-nothing RFQ. We are not accepting offers for a piece or just pieces of this system. Your offer will not be considered unless it is for the entire system, to include ALL SITE WORK IAW the SOW. -------------------------------------------------------------------------- QUESTIONS AND ANSWERS (Q&A; 2026 Apr 30) - vendor-submitted Q&A have been posted on this date. -------------------------------------------------------------------------- AMENDMENT 01 (2026 Apr 20/1030 hrs) - site visit date and time have changed, to include due date for site visit confirmation . Offer due date has changed . See the solicitation document pages 1 and 2 - named FA813226Q0029 Amd 01 - Next Gen High Pressure Cold Spray System 2026 04 20 - for changes, all of which are highlighted in blue. -------------------------------------------------------------------------- *** NOTE FOR POTENTIAL OFFERORS [2026 04 20 0906 hrs] -- this is an all-or-nothing RFQ. We are not accepting offers for a piece or just pieces of this system. Your offer will not be considered unless it is for the entire system, to include ALL SITE WORK IAW the SOW. -------------------------------------------------------------------------- NEXT GEN HIGH PRESSURE COLD SPRAY SYSTEM : consisting of the following equipment - - Impact Innovation EvoCSII Cold Spray Machine – [BRAND NAME] configured for Helium & Nitrogen Carrier Gas and Mutli-Gas Sprays; equipped with nozzle cooling, powder feeder station configured for 2 powder feeders, and 2 powder feeders; EvoCSII 6/11 AH Cold Spray Gun; includes all additional tools listed in Appendix A of the Statement of Work (SOW). See SOW for machine details. - Fanuc M-710iC/50 Industrial Robot – [BRAND NAME] delivered with all options listed in the SOW. - Nitrogen Supply System – capacity sufficient to meet gas consumption on 4-6 week refill schedule; compressor sized to produce 3600psig; gas provided at 99.999% purity; configured for outdoor service; configured with capacity telemetry to schedule delivery; foundation assessment (new foundation, if required); see SOW for details. - Argon Fire Suppression System – meets requirements set in NFPA 484 and NFPA 2001. See SOW for details. - HiWatch HR2 Particle Measurement System – [BRAND NAME] with sensor. See SOW for details. - ReliaCoat In-Situ Coating Property (ICP-8) Sensor – [BRAND NAME] see SOW for details. - Dust Handler/Collector – with spark arrester and blast venting. See SOW for details. - High-Pressure Gas Plumbing – see SOW for details. - Ancillary Equipment – all additional items and components included as listed in SOW - System Integration – as outlined in SOW. - Installation – see SOW for details. - Training – see SOW for details. All details are listed in the Statement of Work (SOW). This is a Brand Name Requirement for four of the system components IAW RFO FAR Subpart 11.204 and the …
Classification
Place of Performance
Contracting Office
Contacts