Description
SOURCES SOUGHT NOTICE Notice Type: Sources Sought / Request for Information (RFI) Title: Switchboard and Motor Control Center (MCC) Panel Replacement Service Location: ALTESS Data Center, Radford Army Ammunition Plant, Radford, VA 1.0 Introduction and Purpose This is a Sources Sought Notice issued for market research and planning purposes only. This is NOT a solicitation, Request for Proposal (RFP), Request for Quotation (RFQ), or Invitation for Bid (IFB). It does not constitute a commitment by the Government to issue a contract, nor will the Government pay for any information submitted in response to this notice. The purpose of this Sources Sought is to identify qualified and capable sources (including Small Businesses, 8(a), Service-Disabled Veteran-Owned, HUBZone, and Women-Owned Small Businesses) that can provide the required removal, installation, and integration services for switchboards and Motor Control Center (MCC) panels at the ALTESS data center. 2.0 Background and Scope Summary The Contractor shall provide removal of one (1) Westinghouse switchboard and Motor Control Center (MCC) panel located in RM 241, and one (1) GE switchboard to include associated Motor Control Center (MCC) panel located in RM 119, and provide customized installation of one (1) Eaton (or equal) switchboard and Motor Control Center (MCC) panel located in RM 241, and one (1) Eaton (or equal) switchboard and Motor Control Center (MCC) panel located in RM 119 located within the ALTESS data center located on site in Radford, VA 24141-1061. Specific Tasks: GE Fused Switchboard and Motor Control Center (MCC): GE fused switchboard and motor control center (MCC) panel replacement service shall include: Room 119 Equipment Removal & Installation Services: Removal of existing GE Fused Switchboard and MCC panel and all associated components. Disconnect two (2) hot water pumps from GE MCC during removal. Hot water pumps must be temporally powered via alternate source until new MCC panel is operational. Hot water pumps will be reconnected to new MCC and functionally tested. Enclosed starters must be provided (if applicable) Removal of all feeder circuits from GE switchboard to GE MCC. Through circuits identified during demolition shall be rerouted to maintain operation of assigned equipment. One (1) circuit passes through to feed the Air Handler Unit (AHU) -1, and its associated CTs and Trane controls integration components shall be moved. All old unused control circuits within MCC shall be removed back to their origination points. Identified control circuits will be going to the existing Powers Controls hand-off-auto (HOA) board in RM 119. All controls wiring, current transformers (CTs), and components supporting Trane Building Automation System (BAS) and/or Schneider Electric StruxureWare monitoring systems shall be kept intact and reinstalled into new MCC panel. All work tied to the BAS system shall only be verified and recommissioned by a certified Trane Autho…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (2)