Description
Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for EHRM INFRASTRUCTURE UPGRADES as required by drawings and specifications. Project scope includes, but is not limited to, the following infrastructure upgrades: Electrical (electrical panel upgrade, power [normal, emergency]); Bonding; UPS; Building Management System interfaces; new/upgraded existing HVAC; reconfiguration, expansion, and renovation of existing space (demo, new construction, finishes, cable); space renovation for Data Center (expanded space, cable management, server rack configuration); communications infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary; physical security upgrades; upgrade fiber infrastructure backbone campus-wide within buildings and between buildings; provide diversified path for WAN; and Hazardous Materials abatement. Project buildings include 1, 2, 11, 18, 29, 46, 96 and site.
Classification
Place of Performance
Contracting Office
Contacts