Description
Description: This is a SOURCES SOUGHT NOTICE for information only. Replies by interested parties will be used by this agency for preliminary planning purposes. No proposal or contract will be awarded from this notice. No reimbursement will be made for any costs associated with providing information in response to this notice or any follow up information requests. The U. S. Army Corps of Engineers has been tasked to solicit and award a firm fixed price contract to design and construct a Precision Guided Munitions (PGM) Facility at Nellis AFB, NV. Project Scope: Design and construct a 14,700 square foot Munitions Maintenance Facility with an option of an additional 1,550 SF maintenance bay and associated infrastructure to support Nellis AFB mission requirements. The PGM accommodates missile and glide munitions assembly and disassembly inspection, testing and repair. The base facility consists of (4) individual drive-through work bays, a test cell room for electrical and resistance checks of rocket motors, a secure administrative and briefing space, ready and training rooms, a tool and test equipment support room, supply and equipment storage and latrines. The PGM is a high-bay facility with exterior roll-up metal coil doors for the movement of equipment to and from the flightline. The facility will be constructed with reinforced concrete foundation/floor slab, structural steel frame, fully grouted CMU and standing seam metal roof. Each bay will contain a 2-ton overhead bridge crane. The facility's security system will include security fences, gates, an intrusion detection system (IDS), access control system (ACS), and closed-circuit television (CCTV) as well as cybersecurity measures for facility-related systems. The supporting facilities include all site preparation, storm water management, electrical, communications, water and sewer utilities, fire detection and suppression systems. The facility will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements, UFC 1-200-02, High Performance and Sustainable Building Requirements and other UFCs as appropriate. The facility will also need to comply with DESR 6055.09_AFMAN 91-201 Explosives Safety Standards. The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This project will comply with DoD antiterrorism / force protection requirements per unified facilities criteria. Special Construction Requirements: Secure work areas specifications and construction in accordance with ICD/ICS 705 is necessary for mission-essential primary facilities. Minimum Capabilities Required Include the Following: Work includes the design, construction and installation of: reinforced concrete foundations, concrete floor slab, structural steel frame, concrete masonry units, gypsum wallboard, and a combination singl…
Classification
Place of Performance
Contracting Office
Contacts