Description
CORRECTED QUANTITY AND DELIVERY DATES.CEMENT, PORTLAND, GRAY, FOR GENERAL CONCRETE CONSTRUCTION.PORTLAND LIMESTONE CEMENT TYPE IL, TO MEET SPECIFICATIONS OF ASTM C595 AND AASH TO M 240 FOR TYPE IL CEMENT.94 LB BAGS, PALLETIZED AND WRAPPED CERTIFICATE OF CONFORMANCE / MATERIAL CERTIFICATION REPORT REQUIRED AND SDS REQUIRED COC/COA MUST INCLUDE MANUFACTURER NAME, PRODUCT NAME/DESCRIPTION, SPECIFICATION, LOT/BATCH NUMBER, MANUFACTURE/EXPIRATION DATE, ANALYTICAL DATA, STATEMENT OF NO CHANGE IN MATERIALS OR PROCESSES, AND SIGNATURE OF AUTHORIZED REPRESENTATIVE.PACKAGING LABELS WILL INCLUDE MANUFACTURER NAME, PRODUCT NAME/DESCRIPTION, LOT/BATCH NUMBER AND MANUFACTURE/EXPIRATION DATE.COC/COA APPROVAL BY MCAAP AO REQUIRED BEFORE CONTRACT AWARD.-----------------------------------------------------------------------------------DELIVERY DATES JULY 22-2026, 49350 LBS (525 BAGS)AUGUST 12,2026 49350 LBS (525 BAGS)AUGUST 26, 2026, 49350 LBS (525 BAGS)SEPTEMBER 16, 2026, 49350 LBS (525 BAGS)SEPTEMBER 28, 2026 49350 LBS (525 BAGS)
Classification
Place of Performance
Contracting Office
Contacts