Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 and supplemented with additional information included in this notice. ASRC Federal Gulf State Constructors, LLC, the Prime Contractor to the U.S. Government at Vance Air Force Base, issues this solicitation on behalf of the U.S. Government under the Vance AFB BOS contract. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. It is the sole responsibility of all offerors to frequently check this posting on SAM.gov for any amendments, updated attachments, or changes to this solicitation. Failure to acknowledge and comply with posted amendments may result in a quote being deemed non-responsive. Funding Notice (Unfunded Requirement): Funds are not presently available for this requirement. No award will be made until funds are available. AFGSC and/or the Government reserves the right to cancel this solicitation, either before or after the closing date for receipt of proposals. In the event AFGSC or Government cancels this solicitation, AFGSC nor the Government has any obligation to reimburse any offeror for any costs. Quote Validity: Quotes must remain valid for 180 days after the solicitation close date of July 01, 2016 . This extended timeframe will provide the government with the strongest opportunity to secure the necessary funding and ensure continuity in the procurement process. Offers providing less than 180 calendar days for solicitation will not be considered or accepted. Bid Requirements: AFGSC requires a qualified contractor to provide all labor, materials, tools, supervision, equipment, transportation, and incidentals necessary to perform complete roofing replacement at three phases in facilities F200 Administration, F200 Warehouse F244. Work includes (summarized from specifications and drawings): • Full roof deconstruction and removal of existing roofing systems • Removal of existing underlayment, gutters, downspouts, fascia, and standing-seam metal roofing • Installation of: • R-30 nailbase insulation assemblies • Fire-resistant underlayment • New double-lock standing seam metal roofing • New gutters, downspouts, flashing, and trim • Insulated metal wall panels • Structural modifications at gable ends and lean-to transitions • Lightning protection system requirements • Environmental compliance and construction waste management Specifications and drawings govern all details (As attached) CLIN Structure (FFP - Base + Additive Options) Clin 0001 - Base Bid - Repair Roof F200 Administration (XTLF 18-1014A PA) • Roof deconstruction, replacement, insulation, flashing, gutters, downspouts, and all associated work. • Period of Performance; 120-day non-performance period, 120-day performance period, Total: 240 days CLIN 0002 - ADDITIVE OPTION 1 - Repair Roof F200 Warehouse (XTLF 18-1014 PB) • All work equivalent in scope categories to …
Classification
Place of Performance
Contracting Office
Contacts
Attachments (5)