Description
Dear Offerors, The United States Embassy in Sri Lanka invites you to submit proposals for the Supply & Installation of uPVC Door Systems . Description Supply, fabricate, and install complete uPVC door systems including fixed glazed units, sliding doors, and hinged doors as per approved drawings and door schedule. Systems shall be of uniform manufacturer profile, UV-stabilized, weather-resistant uPVC with factory-fabricated double-glazed insulated glass units (IGUs), minimum 8 mm thickness overall, argon-filled, hermetically sealed, and fully tempered safety glazing compliant with ANSI Z97.1 and CPSC 16 CFR 1201. All assemblies shall include European-grade hardware, multi-point locking, heavy-duty rollers, handles, and soft-closing mechanisms. Installation shall include complete sealing, gaskets, beading, and corrosion-resistant fixings ensuring airtight, watertight, and thermally efficient performance. System shall ensure durability, non-warping performance, uniform aesthetics, and long-term functional stability. Provide a 5-year material warranty and 2-year workmanship warranty. Local Execution, Responsiveness, and On-Site Requirements To ensure timely execution, quality assurance, and effective project coordination, the following mandatory requirements apply: Local Project Execution Capability The Contractor shall have an established local presence in Sri Lanka, either as a registered company, joint venture, or formally authorized local representative. Proof of local office, operational base, or permanent technical support facility shall be provided. On-Site Supervision and Mobilization Contractor must provide qualified on-site supervision throughout the project duration. Mobilization of personnel, materials, and equipment must be completed within the agreed project timeline and in no case exceed 5 to 10 calendar days from notice to proceed. Response Time and Project Support The Contractor must ensure technical response within 24–48 hours for all site coordination, installation issues, and clarification requests. Emergency or critical site support shall be available on call within Sri Lanka during execution phase. Travel, Logistics, and Cost Responsibility All travel, accommodation, transport, customs clearance, and logistical costs associated with project execution shall be fully borne by the Contractor. The Embassy will not be responsible for international travel or mobilization expenses. Site Familiarization and Attendance Attendance at the pre-proposal conference and site visit is strongly encouraged and may be required for technical qualification. Failure to demonstrate familiarity with site conditions may result in technical non-responsiveness. After-Sales Support and Warranty Service Contractor shall maintain local warranty support capability in Sri Lanka for the full warranty period. Replacement parts and service response must be available locally without dependence on extended international shipping delays. Attachments Statement of Wor…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (2)