Description
Amendment 001 to Solicitation #36C25926Q0384 (Trash Removal Services) This amendment s purpose is to: Remove a line item no longer needed (0008, 1008, 2008, 3008, and 4008) Provide an updated SOW with the removal of the line item List and answer the questions submitted by the questions deadline as specified in the solicitation. Line item 0008 (and all corresponding line items in subsequent option years: 1008, 2008, 3008, 4008) is hereby removed from the solicitation for the recycling services of wooden pallets. All wooden pallets shall be smashed by VA employees and placed in the 30-yard roll off dumpster. Line Item Description Qty Unit of Measure 0001 Waste/Trash Removal from QTY: one (1) 8-yard Compactor (3x/week + 12 additional; estimated) 168 JB 0002 Monthly 8-yard Compactor Rental 12 MO 0003 Waste/Trash Removal from QTY: two (2), 8-yarder Trash Bin Containers (2x/week) 104 JB 0004 Waste/Trash Removal from QTY: one (1), 30-yard Roll Off Dumpster (2x/month + 6 additional; estimated) 30 JB 0005 Disposal Fee per Ton (for 30-yard Roll Off Dumpster) Approx. four (4) tons per haul; up to 30 hauls per year 120 EA 0006 Waste/Trash Removal from QTY: twelve (12), 96-gallon Recycling Carts (1x/week) 52 JB 0007 Monthly Baler Rental with Baled Cardboard Pick-ups (1x/every 2 weeks) 12 MO 0008 Recycling of Wooden Pallets (2x/month) 24 JB **Remove 1008, 2008, 3008 and 4008 from all quotes recycling of pallets no longer needed in any year of performance* Updated Statement of Work section: REQUIREMENTS: Contractor shall provide containers and services as listed below: One (1), eight (8) yard compactor emptied three (3x) times per week (an additional 12 pickups/hauls/jobs added in case of unanticipated increased need throughout the year, as needed). The services shall be completed on the agreed upon schedule of three (3) pickups per week on Monday, Wednesday, and Friday. The trash compactor must be provided by the vendor. Any costs for the rental fee should be included in the line item listed above. Costs for installation and removal should be included in the rate. The compactor shall be bolted to the ground and include a detachable container for dumping solid waste only. A new replacement container for the compactor shall be provided by the Contractor twice per year approx.. every 6 months. The Contractor shall power wash the cement prior to the replacement of the new container for the compactor Two (2), eight (8) yarder trash bin containers emptied two times (2x) per week. One (1), 30 yard roll off dumpster emptied two times (2x) per month (an additional 6 pickups/hauls/jobs added in case of unanticipated increased need throughout the year, as needed). The facility may require unscheduled additional pickup outside of the regular schedule depending on ongoing project and facility needs. The VA COR shall coordinate with the vendor when additional, unscheduled pickups are required. Disposal fees for each haul shall be invoiced specifying how many tons are includ…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (3)