Description
Combined Synopsis/Solicitation for commercial goods and services IAW FAR part 12. Defense Supply Center Richmond (DSCR) B60 HVAC Demo This is a solicitation for construction prepared in accordance with the format in FAR Part 36, as supplemented with additional information included in this notice. The solicitation number SP4703-26-Q-0045 is issued as a request for quote (RFQ). The resulting contract will be a firm-fixed price award with a period of performance of 90 days after the Notice to Proceed. 1. OBJECTIVES Contain, demolish and dispose of an abandoned air handler system that has been tested and confirmed to contain asbestos. Once demolished the area where the air handler was located is to be sealed in order to prevent any possible entry to the area it was originally intended for. 2. BACKGROUND Building 60D has an abandoned air handler system that has been confirmed to contain asbestos, which is harmful to humans if exposed. Since the area is mainly for storage, there is no need for a replacement HVAC system to be put in its place and it should be sealed to match the surrounding area. 3. SPECIFIC REQUIREMENTS The contractor shall: 3.1 Mobilization • Submit an Asbestos Abetment Plan for acceptance prior to mobilization • Deliver any equipment that is to be used in the running of this project such as: scaffolds/lifts, safety equipment, power/metal working tools, etc. • Set up a ventilation system to ensure proper air filtration, decontamination and to always maintain a negative air pressure in the containment area. 3.2 Site Preparation and Protection • Install barriers to isolate the work area. • Make any preparations necessary to ensure the area is contained so that no debris leave the designated work area. 3.3 Asbestos Abatement • Removal Method: Utilize a mechanical method to remove all material that contains asbestos. o The contractor is to submit their method of removal with their proposal, if rejected with applicable time the contractor may revise their proposal with alternative removal method. • Provide Personal Protective Equipment such as respirators, gloves, goggles etc. for all personnel in the containment area. o All personnel in the work area must properly equip all required PPE when in the designated containment area. • Properly collect and dispose of all asbestos-containing debris and wastes hazardous material off site. o All manifests for the disposal of ACM must be signed by the environmental Hazardous Waste Manager prior to shipping material off-site. 3.4 Demobilization and clean up • Have a clearance test performed by a third-party inspector to ensure the area has been decontaminated and is a safe working environment. • Dispose of any contaminated material off-site i.g. tarps used to cover equipment, HEPA filters used for ventilation, other PPE that cannot be reused, etc. in a manner that is in accordance with EPA guidelines. • Provide any post abatement test results to the Project Manager/Contracting Officer Representative.…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (3)