Description
The Department of the Interior (DOI) - Critical Acquisition Response Team (CART), on behalf of the National Park Service (NPS) has a requirement for Independence National Historical Park (INDE) GENERAL: This is a NEW requirement. This is a PRE-SOLICITATION NOTICE only and does not constitute a solicitation; accordingly, no response is due at this time. No questions nor phone call will be accepted about this pre-solicitation notice. All questions and phone calls will be addressed after the solicitation is posted through official amendments. Specific instructions on submitting proposals will be contained in the solicitation documents. It is anticipated that the solicitation will be issued sometime on or after April 24, 2026! The entire solicitation package, including all attachments, will be available electronically through SAM.gov only. Paper copies of this solicitation are not and will not be made available. Anyone wishing to participate in this proposed procurement must obtain their copy from SAM.gov | Home. Copies will not be mailed from the Contracting Office. All amendments will be posted on SAM.gov | Home. Contractors will be solely responsible for obtaining amendments from this site to update files. PROJECT SCOPE: The general scope of work includes: The National Park Service - Contracting Operations - Critical Acquisition Response Team (CART) is seeking one (1) contractor to provide all labor, supervision, materials, tools, supplies, transportation, personal protection equipment, and support equipment incidental for the rehabilitation of the Second Bank Block Landscape features. A. Base item work consists of: 1. Replacement of damaged walkways and paving, including the Morris Sculpture surrounds 2. Construction of an exposed aggregate concrete walk to replace the desire pathway. 3. Address drainage deficiencies through regrading and reseeding and repair of drainage systems 4. Restoration of trees and shrub plantings around Morris Plaza. 5. Helical pile foundation repairs at Morris Statue base and pier at south Walnut Plaza. B. Optional/Additive Items work consists of (Subject to Availability of Funding): 1. Optional Item 1: Repair of deteriorating perimeter walls 2. Optional Item 2: Restoration of interpretive site walls representing historic structures on new foundations and associated soils and planting renewal 3. Optional Item 3: Conservation of Robert Morris statue and stone plinth off-site and restoration/repair and cleaning of marble base and steps. Replacement of concrete foundation. Reinstallation of sculpture. 4. Optional Item 4: pervious concrete instead of exposed aggregate concrete as stated in (A)(2) above. PERIOD OF PERFORMANCE: Approximately 365 days after Notice to Proceed. Notice to Proceed will not be issued until submittals are approved, and confirmation of mobilization date. Submittals shall begin ten (10) calendar days after award. PLACE OF PERFORMANCE: Independence National Historical Park, Philadelphia, PA. PROCUREMEN…
Classification
Contracting Office
Contacts