Description
*ANNOUNCEMENT* This is a commercial service construction project in accordance with E.O.14271 This is an update to presolicitation number W50S9526B0001 and W50S9526BA001 to provide interested bidders with the revised system assigned solicitation number, to update the PSC code to Z1BD, and to add two options to this requirement noted below. All information contained in prior announcements remains unchanged. The USPFO for South Carolina intends to issue an Invitation for Bid to award a single firm fixed- price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary to repair and expand airfield pavements to meet standard by utilizing conventional design and construction methods at McEntire JNGB. The scope of this project will consist of the removal of existing substandard concrete and asphaltic pavement and the installation of new base course, new concrete pavement (PCC), storm water drainage improvements, relocate taxiway edge lights, signage and paint taxi lines for base assigned and transient aircraft. All new pavements will be compatible with applicable Department of Defense (DoD), Air Force, and installation design standards and criteria. In addition, local materials and construction techniques shall be used where cost effective. The work is located at McEntire Joint National Guard Base near Eastover in Richland County, South Carolina. The award is anticipated to consist of the following line items (CLINs): CLIN 0001: Base Bid. In addition to a base work described above, the solicitation will include the following option line items: 1. Replace all Signs and Lights, and 2. Reseal Ready Alert Apron. This project is set aside 100% for Small Business. The North American Industry Classification (NAICS) Code is 237310, with a size standard of $45,000,000.00. The magnitude of the project is between $10,000,000.00 and $25,000,000.00. The project is anticipated to occur in two stages with a total contract duration of 365 days after notice to proceed (NTP). The first stage will consist of an anticipated 180-day pre-construction period for submittal approval, testing, mix designs, submission of required permits, etc. The second stage will consist of an anticipated 180-days of actual construction. No work shall begin on stage two until the government has fully accepted stage one and issued a separate NTP (this may not start immediately following stage one completion). If option(s) are unilaterally exercised within the timeframe noted in FAR 52.217-7 they shall be completed during the second stage of the Base Bid 180 days of actual construction and will not extend total period of performance. *NOTE: The NTP for stage two construction will contain either the number of days remaining from the original 365 days after government acceptance of stage one or 180 days, whichever is greater. Your attention is directed to FAR Clause 52.219-14(e)(3) (DEVIATION 2021-O0008), …
Classification
Place of Performance
Contracting Office
Contacts