Description
Update 4/17/2026 Addition of two attachments to the solicitation. One of the provided attachments is noted to be a sign in sheet for the conducted site visit on 4/9/2026, labelled as "PROJECT 26Z2AS7 MODERNIZE AND UPGRADE ELEVATOR SITE VISIT SIGN IN SHEET". The second attachment that is to be added to the solicitation posting is a condensced meeting minutes for the conducted site visit, labelled "PROJECT 26Z2AS7 SITE VISIT MEETING MINUTES SHEET". The added documents are controlled and access to the documents must be requested. Update 4/13/2026 Addition of combined Q&A response sheet and photo sheet from site visit conducted on 4/9/2026. File added to attachment/links section titled "26Z2AS7 MODERNIZE AND UPGRADE ELEVATOR Q-A AND PHOTO SHEET". The added document is controlled and access to the document must be requested. Dear Offeror: Please review all sections of this solicitation packet, the solicitation, and all attachments. This information is essential to submit a valid and complete offer. The Federal Bureau of Prisons (FBOP) is issuing solicitation 15B20726Q00000009 for the award of a firm-fixed-price construction contract for a project entitled ELEVATOR UPGRADE AND MODERNIZATION at the Federal Correctional Institution (FCI Lewisburg), located in Lewisburg, PA. FCI LEWISBURG is a federal correctional facility located at 2400 Robert F. Miller Dr., Lewisburg PA 17837. The Work of Project is defined by the Contract Documents and consists of the following: All offers must come with an offer guarantee. All offers are also subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference. Offers must provide a minimum of 30 calendar days for Government acceptance after the date that offers are due. Offers that do not provide this minimum acceptance timeframe may be rejected. Should the offer be accepted within 30 calendar days following the date offers are due, offerors must also perform the work at the prices they specify on the attached SF-1449 solicitation document in strict accordance with the solicitation. The contractor will provide all necessary equipment, labor, materials, and incidentals unless stated otherwise in the Statement of Work to upgrade and modernize the one (1) passenger elevator. Incidentals include but are not limited to cleanup of work area and disposal of waste materials. See the Statement of Work included with the solicitation posting for the complete requirements list. The contractor is expected to begin work within 10 days of receiving the notice to proceed. The performance period for the project will be 308 Calendar Days from issuance of the notice to proceed. The NAICS code for this requirement is 238290. Pursuant to Justice Acquisition Regulation (JAR) 2836.204, the estimated magnitude of the project lies between $100,000.00 and $250,000.00. (NOTE: This range is one of 5 available ranges from JAR 2836.204 and is not meant to imply that the projec…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (4)