Description
**Amendment 0003: Updates Attachment K and adds a Citizenship Requirement to the CSI 00 73 00 supplemental text. The revised attachment clarifies the RSVP deadline as 14 April and reschedules the site visit for 22 April.** In general terms, the project consists of a Design-Bid-Build acquisition strategy for construction services. Specific requirements include: New construction of an approximate 45,000 SF Rocket and Missile Maintenance Facility (RMMF) warehouse and associated administrative support functions. Adjacent to the RMMF is an approximate 10,000 SF storage building and 1,000 SF forklift charging shed. Associated site development includes but is not limited to earthwork, BMPs, fencing, roadways and hardscape areas that support the loading and unloading of munitions. The project further includes the replacement of the existing Voelz Gate Access Control Point (ACP) and associated hardscapes. The new ACP includes an approximate 1,600 SF combined gatehouse, inbound/outbound lanes with commercial vehicle inspection canopies, and associated active and passive vehicle controls. Associated site development includes but is not limited to earthwork, BMPs, fencing, roadways, and hardscape areas that support the operations of the access control point and commercial vehicle inspections.
Classification
Place of Performance
Contracting Office
Contacts