Description
THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY Updated 9 April 2026 Proposal due date is extended to 14 April 2026. THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY Updated 6 April 2026 Government response to Pre-bid Follow-up RFIs have been attached. THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY Updated 24 March 2026 Amendment 2 issued to allow additional RFI questions, due 25 March 2026 at 1600 CST, and to extend the proposal due date and time to 10 April 2026 at 1600 CST. The extension is to give additional time for RFI question submission and response. THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY Updated 23 March 2026 Government response to Pre-bid RFIs, including question #21, has been attached. Please see Pre-Bid RFI Government Response ver 2. THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY Update: 12 March 2026: Amendment 1 is issued to extend the proposal due date and time to 25 March 2026 at 1600 CST. RFI responses are not complete and the extension is to give additional time for RFI response completion and posting. THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY Updated 4 March 2026 Government response to Pre-bid RFIs have been attached. Question 21 is still awaiting a response. Once we have received the response, we will upload it. Current due date for proposals is Friday, March 13 at 1400CST (4:00pm). February 19, 2026: Solicitation posted to SAM THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY Updated 2 February 2026 Initial Site Visit is set for Thursday, 05 February, 2026 at 1300 (1:00 pm) CST on Tinker AFB, B9001. Meeting location will be at B9001 in the Administration Entrance on the south end. This entrance is by the flagpole. THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY Project Solicitation Number: FA813726R0008 Project Title: WWYK150083 - Repair Transformer Vault 6, B9001 Project Location: Tinker AFB, B9001 IAW FAR 36.204 the magnitude of this project is between $1,000,000 and $5,000,000 Repair to building 9001 transformer room #6 located at column X37 to Y38 on the roof. The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair by replacement of the two gas filled 2000KVA transformers, associated 480V switch gear labeled #6C and #6D, all 15KV switches, and the original 3000A tie bus which have exceeded their rated life expectancy. Repair by replacement the interior lighting, add visual fire alarm notification devices(s) as required to meet ABA requirements, and repair the vault's exterior at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information). Project specific documents are attached to this posting. If you experience any difficulty at receiving or accessing the project specific documents, send an email request to Contracting Points of Contact lis…
Classification
Place of Performance
Contracting Office
Contacts