Description
SOURCES SOUGHT: THIS IS NOT A NOTICE OR REQUEST FOR PROPOSAL BUT FOR INFORMATIONAL AND PLANNING PURPOSES ONLY! This notice does not constitute a commitment by the Government. All information submitted in response to this announcement is voluntary and the Government will not pay for information requested nor will it compensate any respondent for any cost in developing information provided to the Government. If a solicitation is issued, it will be announced at a later date and all interested parties must respond to that solicitation announcement separately from responses to this announcement. This notification is being conducted by the 163rd ATKW at March ARB. This Sources Sought is only intended to identify potential sources for the purpose of market research, describes only the current contemplated scope of potential requirements and may vary from the scope of the requirement in a final SOW included in any RFP. The Sources Sought number is 26-P-0000 035891 and shall be used to reference any written responses to this Sources Sought. The anticipated North American Industry Classification Systems (NAICS) code is 238220, Finish Carpentry Contractors with a size standard for the proposed NAICS of $19M. Business Status: The Government is interested in all Small Businesses that are capable of meeting this requirement , including, HUBZone, SDVOSB, WOSB, VOSB, and general Small Businesses. Replace AHU and associated components. Work includes demolition, mechanical, plumbing, electrical, and controls. AHU are rooftop supported on raised galvanized steel frames. They are cooling only supplied from Chiller Plant. AHU Bldg A AHU - Side Discharge TRANE CSAA040UB Replace AHU per Specifications Replace disconnect switches and conduit. Provide Commissioning. Integrate into existing Automated Logic Controls and demonstrate functionality at EMSC Workstation in Building B. Provide 5 year full warranty parts and labor. Crane Lift Plan submittal to include LL, SE, AGL AMSL, OE/AAA, & FAA 7460-1. Submit ASN to FAA and obtain approval. Allow three month review period in schedule COMPONENTS From POC to AHU replace all mechanical piping & components including Belimo control valves and actuators, flow valves, isolation valves, strainers, gauges etc. Replace smoke duct detectors and fire alarm testing. Provide exterior aluminum jacketed insulation on piping and valves. Plenum has foil faced butyl sealing tape at most joints. Prep and provide at remaining joints. Replace PVC condensate line with copper Type K. Align piping to roof drain. Replace wood with rubber supports. CAPABILITY STATEMENT : Firms responding to this Sources Sought notice are requested to provide a capability statement. At a minimum, the capability statement must include: Company Name Point of Contact Name Unique Entity Number (UEI) and CAGE Code Small Business socio-economic status under NAICS 238350 Brief descriptions of recent and relevant projects for tas…
Classification
Place of Performance
Contracting Office
Contacts