Description
The United States Coast Guard (USCG) Surface Forces Logistics Center (SFLC) is seeking responses from industry to determine capability and interest in performing the Fiscal Year 2027 (FY27) for the United States Coast Guard Cutter (USCGC) HEALY Dock Side. The USCG is interested in determining overall vendor interest, availability, and capability to perform this work at the USGC HEALY's homeport. The anticipated Request for Proposal (RFP) release date is in July 2026. Planned availability and RFP dates are subject to change. Estimated period of performance is Jan. 5, 2027 through May 9, 2027. In addition, no cost or pricing data is required in the vendor's response to this Sources Sought Notice. All responsible sources may submit a capability statement, which will be considered by the agency; see Attachment 1; Attachment 1 HEALY DS27 Questionnaire. Background Information: The USCGC HEALY is homeported in Seattle, WA at 1519 Alaskan Way S., Seattle, WA 98134. The USCGC HEALY, the Coast Guard's largest vessel, is 420 feet long, 82 feet wide, drafts 31 feet (at full load), and weighs 16,660 long tons (at full load). Note that it is excepted that during performance of the dock side there will be a significant amount of work that will be done on the Science Winch Control Systems, Cycloconverters, and the Main Diesel Engines by the Original Equipment Manufacturer (OEM), GE Power, Power Conversion, that may require laydown area on the pier, as well as regular coordination with the Coast Guard and the OEM to avoid overlap in work and other issues that may arise. Significant work items include (but not limited to): Fire Prevention, Provide Temporary Services, Provide (Cutter) Recapitalize Science Data Network Infrastructure (SLEP) Recapitalize CG One Network Infrastructure (SLEP) Recapitalize Ice Radar (SLEP) 28 Volt DC Helo Power Supply, Load Test, Perform 400 Hz Electrical Power Distribution System, Load Test and Thermographic Inspection Impressed Current Cathodic Protection, Upgrade Oceanographic Winch, Inspect and Test Scientific and Ocean Engineering Systems, Control System Groom and Indicator Calibration Damage Control and Fire Fighting Systems, PMS Oily Water Separator, Annual Maintenance Auxiliary Seawater System (ASW) Orifice Plate, Renew Aux Diesel Generator Starter (SLEP) Steam Coil Pre-Heaters, Inspect and Test Refrigeration Plant, Maintain Boiler Annual Maintenance Bow Crane, Annual Inspect and Test Internal Hoists, Maintenance, Inspection and Test Grey Water Holding Tanks, Clean and Inspect Sewage Piping, Clean and Flush Sewage Holding Tanks, Clean and Inspect Main Motor Lube Oil Tank Heater, Inspect Ship Service Air Compressor, Overhaul Fuel Oil Purifier (FOP) Overhaul Lube Oil Purifier (LOP) Overhaul Relocate Cycloconverter Strainers (SLEP) Recapitalize MSW & ASW Valves (SLEP) Science Sea Water Pump Strainer (SLEP) A-Frames, Annual Inspection Science Van Monorail System, Overhaul Oceanographic Winch, Inspect and Test Steam Trap, Renew Steam…
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)