Description
THIS IS A SOURCES SOUGHT FOR MARKET RESEARCH ONLY. NO QUOTES WILL BE EVALUATED IN RESPONSE TO THIS POSTING. The contractor shall provide all management, tools,supplies, equipment, labor and hardware necessary to install pre-purchased wind tarps for 624 Red Horse Road, building 90538, Hurlburt Field, FL, to close sides of facility and preventweathering of equipment and limit personnel exposure to outside elements. The contractor shall within 30 days of award of contract: Install pre-purchased wind tarps (located on-site) by modifying as needed with grommets, etc. to facilitate their covering the building perimeter, effectively providinga fabric wall against wind and weather. Corrosion-resistant, stainless-steel cables,brackets, and eyelets will be used so as not to drill into any existing steel girder support system that may cause degradation to the structure over time. Installing eyelets into the concrete foundation to facilitate anchor points for the lower portions of the tarps will be necessary. Hardware must allow tarps to be raised/lowered to facilitate adjustment for varying environmental conditions in compliance with the current Florida Building Code and all applicable Occupational Safety and Health Administration (OSHA) standards, including fall protection requirements under 29 CFR 1926. Please see the Draft SOW attached to this posting for further details. If your company is both capable and interested in fulfilling this requirement, please contact the POC by 20 May 2026 at 1100 CDT.
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)