ALLIANCE CONSTRUCTION CONTRACTORS LLC
UEI: D3XBY1UYSRB8
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$331K
Received · FY2025–FY2027
$331K
Received · all years
6
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| VALIANT GOVERNMENT SERVICES LLC | $331K |
Most recent
- $30KOMEE VI FT BLISS CONTRACT SUPPORT - VAL-2075 CONTRACTOR TO PROVIDE LABOR, MATERIALS AND EQUIPMENT TO PERFORM COMPREHENSIVE MOLD REMEDIATION SERVICES.
- $63KOMEE VI FT BLISS CONTRACT SUPPORT - VAL-2100 CONTRACTOR IS TO PROVIDE ALL LABOR, MATERIALS, EQUIPMENT TO REMOVAL, REMEDIATION, SANITIZATION, AND RESTORATION ACTIVITIES REQUIRED DUE TO BLACK WATER DAMAGE AFFECTING THE ABOVE-LISTED AREAS WITHIN THE MORGUE AND ADJACENT SPACES.
- $38KOMEE VI FORT BLISS CONTRACT SUPPORT - VAL-2037 CONTRACTOR TO PROVIDE LABOR, MATERIALS AND EQUIPMENT TO PATCH AND WATERPROOF DIFFERENT SECTIONS OF THE ROOF. THE CONTRACTOR WILL CLEAN THE SURFACE AND APPLY AN ELASTOMERIC COATING IN AREAS AND PENETRATIONS THROUGHOUT THE ENTIRE ROOF THAT SHOW DETERIORATION AND COULD BE A POSSIBLE POINT OF WHERE WATER ENTERS THE BUILDING.
- $49KOMEE VI FORT BLISS CONTRACT SUPPORT - VAL-2038 CONTRACTOR TO PROVIDE LABOR, MATERIALS AND EQUIPMENT NECESSARY TO PERFORM MOLD REMEDIATION SERVICES IN BUILDING 2496, IN ACCORDANCE WITH THE TEXAS MOLD ASSESSMENT AND REMEDIATION RULES (TMARR).
- $81KOMEE VI FORT BLISS CONTRACT SUPPORT - VAL-2025 CONTRACTOR TO PROVIDE LABOR, MATERIALS AND EQUIPMENT TO REMOVE AND REPLACE DAMAGED SHEETROCK IN STAIRWELL NO 3 ON (3) LANDINGS. PROVIDE SCAFFOLDING AND WITH DAILY INSPECTIONS. REPLACE DAMAGED OR WET INSULATION.
- $70KOMEE VI FORT BLISS CONTRACT SUPPORT - PROJECT VAL-1841 CONTRACTOR TO PROVIDE LABOR, MATERIALS AND EQUIPMENT TO REPLACE (2) BROKEN WINDOWS IN ROOMS 103 AND 104, REMOVE EXTERIOR ANCHORS WHERE SIGN WAS MOUNTED, INSTALL EXIT SIGN IN ROOM 106, MODIFY COVER FOR DATA BOX IN CORRIDOR 102 TO ALLOW COVER TO CLOSE PROPERLY, REPLACE FAUCETS IN ROOM 123, 205, 265 AND RESTROOMS THAT ARE LEAKING, REMOVE KEY BOX PATCH AND PAINT IN ROOM 111, REANCHOR WIREMOLD FAILING IN ROOM 203A FROM CEILING, INSTALL NEW VCT (APPROX. 16’X 16’) IN ROOM 216, REPLACE DOOR AND PANIC HARDWARE TO STAIRWELL ROOM 121, REPAIR FAILING VRF COMMUNICATIONS FOR ALL UNITS THROUGHOUT BUILDING. ONCE COMMUNICATIONS IS RESTORED SUBMIT REPORT IF ANY ADDITIONAL EQUIPMENT NEEDS TO BE REPLACED.