BOILER CHILLER SYSTEMS, LLC
UEI: WZNFBRJ5B4A3CAGE: 85F52OMAHA, NE
$2.0M
Obligations · USAspending
Actions Sep '18 – Jul '26
28
Contract awards · USAspending
2
SAM.gov award notices · 12 mo
Top agencies
By obligations · USAspending, all years
- Department of Veterans Affairs$1.6M · 19 awards
- Department of Defense$151K · 3 awards
- Department of Agriculture$114K · 4 awards
- Department of the Interior$79K · 2 awards
Top NAICS
By obligations · USAspending, all years
- 238220 Plumbing, Heating, and Air-Conditioning Contractors$1.6M
- 333415 Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing$141K
- 221330 Steam and Air-Conditioning Supply$101K
- 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance$76K
- 333912 Air and Gas Compressor Manufacturing$54K
Recent awards
Latest contract actions by start date · USAspending
| Award | Agency | Start | Amount |
|---|---|---|---|
| 36C26326P0545 | Department of Veterans Affairs | 07/01/2026 | $54K |
| 36C26326P0237 | Department of Veterans Affairs | 02/15/2026 | $34K |
| FA460026P0010 | Department of the Air Force | 01/12/2026 | $58K |
| 36C26326P0240 | Department of Veterans Affairs | 11/14/2025 | $101K |
| 36C26326P0101 | Department of Veterans Affairs | 10/24/2025 | $22K |
| 36C26325P0641 | Department of Veterans Affairs | 04/03/2025 | $90K |
| 36C26325P0489 | Department of Veterans Affairs | 02/19/2025 | $117K |
| 36C26325P0356 | Department of Veterans Affairs | 12/21/2024 | $32K |
| 36C26324P1203 | Department of Veterans Affairs | 09/10/2024 | $76K |
| 36C26324P0982 | Department of Veterans Affairs | 06/28/2024 | $688K |
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$70K
Received · FY2025–FY2027
$70K
Received · all years
1
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| MILL CREEK FIRELAKE JV LLC | $70K |
Most recent
- $70K1. SUBCONTRACTOR IS REQUIRED TO PROVIDE ALL THE TOOLS, EQUIPMENT, PARTS, AND LABOR TO REPLACE COMPRESSOR FOR CIRCUIT #2 IN BLDG. #17 PENTHOUSE CHILLER WITH A REMANUFACTURED COMPRESSOR. 2. IN ADDITION TO REPLACING THE COMPRESSOR FOR CIRCUIT#2, OTHER PARTS TO BE REPLACED SHALL INCLUDE THE FOLLOWING. 1. FILTER DRIERS 2. LIQUID LINE SOLENOID VALVE 3. TRANSDUCER VALVE ASSEMBLY 4. LIQUID INJECTION ISOLATION VALVE 5. MOTOR STARTED ASSEMBLY 6. COMPRESSOR OIL HEATER 7. EVAPORATOR THERMOSTATIC EXPANSION VALVE 8. OIL CHARGING VALVE 9. CAPACITY CONTROL VALVE