BOYD LANCASTER, INC.
UEI: HUT3XNPLRL77
$2.3M
Obligations · USAspending
Actions Oct '12 – Sep '24
8
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Sep '27
Period of performance through
Top agencies
By obligations · USAspending, all years
- Department of Defense$1.7M · 5 awards
- National Aeronautics and Space Administration$615K · 3 awards
Top NAICS
By obligations · USAspending, all years
- 541711 $1000K
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)$577K
- 332410 Power Boiler and Heat Exchanger Manufacturing$489K
- 331210 Iron and Steel Pipe and Tube Manufacturing from Purchased Steel$239K
- 541990 All Other Professional, Scientific, and Technical Services$23K
- 332811 Metal Heat Treating$15K
Recent awards
Latest contract actions by start date · USAspending
| Award | Agency | Start | Amount |
|---|---|---|---|
| 80LARC24CA003 LIGHTWEIGHT PRIMARY HEAT REJECTION SUBSYSTEM (PHRS) TARGETING NUCLEAR ELECTRIC PROPULSION (NEP) CAPABILITY. THIS WILL INCLUDE DESIGNING MODULAR UNITS THAT CAN BE ASSEMBLED AND/OR DEPLOYED IN SPACE WITH ROBOTICS TO PRODUCE THE LIGHTWEIGHT PRIMARY HEAT | National Aeronautics and Space Administration | 09/30/2024 | $577K |
| 80NSSC24PA522 OT : WELDING HOURS & TECHNICIAN / INTEGRATION OF THE VAPOR DRIVEN SUCTION ELEMENT INTO THE EXPERIMENTAL LOOP HEAT PIPE (E-LHP). | National Aeronautics and Space Administration | 01/31/2024 | $23K |
| 80NSSC22P0192 COPPER AMMONIA HEAT PIPES | National Aeronautics and Space Administration | 11/19/2021 | $15K |
| N6600117P7419 HEAT PIPE ASSEMBLY | Department of the Navy | 02/28/2017 | $137K |
| N6600116P6670 HEAT PIPE, CU/NI (90/10), 1" DIAM. | Department of the Navy | 03/15/2016 | $35K |
| N6600115P7175 HEAT PIPE, CU/NI (90/10) SK744-4381REV 1 | Department of the Navy | 08/10/2015 | $67K |
| N0002413C4069 BASE | Defense Contract Management Agency | 09/05/2013 | $1000K |
| 0001 DESIGN&BUILD BACK FIT EDM | Department of the Navy | 10/25/2012 | $489K |
Expiring contracts
Period of performance ending in the next 18 months · USAspending
- 80LARC24CA003 · National Aeronautics and Space Administration$577K · ends 09/30/2027
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$3.2M
Received · FY2025–FY2027
$3.2M
Received · all years
12
Subawards
5
Primes
Top primes
| Prime contractor | Total |
|---|---|
| RAYTHEON COMPANY | $2.5M |
| LOCKHEED MARTIN CORPORATION | $392K |
| Sierra Nevada Company, LLC | $246K |
| Lockheed Martin Corporation | $79K |
| BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC. | $38K |
Most recent
- $246KPOWER BOILER AND HEAT EXCHANGER MANUFACTURING
- $349KPRECISION MACHINED,HEAT PIPES.
- $137KPRECISION MACHINED,HEAT PIPES.
- $38K12/23/2025 BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC. · FA862025FB092 · Department of Defense (DOD)CHILL PLATE, C1/D1
- $219KBRACKET BATTERY HEATSINK A-ITIK.
- $1.4MPRECISION MACHINED,HEAT PIPES.
- $388KPRECISION MACHINED,HEAT PIPES.
- $142KPRECISION MACHINED,HEAT PIPES.
- $173KBRACKET BATTERY HEATSINK B-ITIK.
- $34KHEAT EXCHANGER.