CACY ELECTRIC
UEI: JEKVSJJZEEN8
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$6.1M
Received · FY2025–FY2027
$6.1M
Received · all years
6
Subawards
3
Primes
Top primes
| Prime contractor | Total |
|---|---|
| I.E.-PACIFIC, INC. | $2.4M |
| LEAD BUILDERS INC | $2.3M |
| COX CONSTRUCTION CO | $1.4M |
Most recent
- $765KD/B/B REPAIR HANGAR 75 AT MCAS YUMA, AZ
- $1.4MBUILDING & SITE ELECTRIC
- $503KD/B B401 UPGRADE STORAGE SPACE, NAVAL AMPHIBIOUS BASE CORONADO, CA
- $479KPHIBCOR-320 RENOVATE FACILITY (CBMM), NAVAL AMPHIBIOUS BASE CORONADO, CA
- $688KPHIBCOR-320 RENOVATE FACILITY (CBMM), NAVAL AMPHIBIOUS BASE CORONADO, CA
- $2.3MDIVISION 0 1 - GENERAL REQUIREMENTS (ALL SECTIONS AS IT RELATES TO YOUR SCOPE OF WORK) DIVISION 03- CONCRETE 03 30 00- CAST-IN-PLACE CONCRETE (COORDINATION ONLY-PROVIDE ENCASED CONDUIT FOR POWER & TELECOM PER DETAIL 1 ON E-801 AND SPEC 33 71 02 PARA 3.15) DIVISION 05 - METALS 05 05 20 - POST-INSTALLED CONCRETE AND MASONRY ANCHORS (THIS CONTRACT WILL NEED TO INSTALL ANCHOR BOLTS IN SUPPORT OF EQUIPMENT BEING SUPPLIED PER MFG 'S INSTRUCTION IF ANCHOR POST INSTALLED ANCHOR BOLTS ARE REQUIRED, CONTRACTOR MUST INSTALL PER 05 05 20. THIS SPEC NEEDS TO BE CHANGED TO 05 50 13-MISC METAL FABRICATION. THIS CONTRACTOR TO SUPPLY AND TURNOVER TO INSTALLATION CONTRACTOR ANCHOR BOLTS FOR LIGHT STANDARDS WHICH FALL UNDER 05 50 13) 05 12 00 - STRUCTURAL STEEL (COORDINATION AND SUPPLY OF MATERIALS) DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07 84 00 -FIRESTOPPING (PROVIDE FIRE PROTECTION AT ALL PENETRATIONS AS SPECIFIED PER DETAIL #3 ON PG. E-802) DIVISION 08 - OPENINGS 08 71 00-DOOR HARDWARE (PER SPEC 26 12 19 PAD MOUNTED TRANSFORMER PARA 2. 6- CONTRACTOR TO SUPPLY PADLOCK FOR TRANSFORMER AND TO FOLLOW DOOR HARDWARE SPEC 08 71 00) DIVISION 09 - FINISHES 09 90 00 - PAINTS AND COATINGS (C1ORDINATION WITH OTHER TRADES ONLY IF, PER PLANS AND SPECS IT WILL BE THIS IVISION 26 - ELECTRICAL 26 05 19. 00 10 - INSULATED WIRE AND CABLE 26 05 48 - SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT 26 05 73 - POWER SYSTEM STUDY (FOR COORDINATION PURPOSES ONLY, SCOPE PERFORMED BY OTHERS) 26 08 00 -APPARATUS INSPECTION AND TESTING (FOR COORDINATION PURPOSES ONLY, SCOPE PERFORMED BY OTHERS) 26 12 19 - PAD-MOUNTED, LIQUID FILLED, MEDIUM-VOLTAGE TRANSFORMERS 26 20 00-LNTERIOR DISTRIBUTION SYSTEM 26 24 13 - SWITCHBOARDS 26 27 14.00 20-ELECTRICITY METERING 26 51 00 - INTERIOR LIGHTING 26 56 00-EXTERIOR LIGHTING DIVISION 27 - COMMUNICATION 27 05 13.43 - TELEVISION DISTRIBUTION SYSTEM (ONLY AS PERTAINS TO PATHWAYS) 27 01 00 - - BUILDING TELECOMMUNICATION CABLING SYSTEM (ONLY AS PERTAINS TO PATHWAYS)