FedOps logoFedOps

ENERGY TECH SYSTEMS INC

UEI: CSMRN3YVLSX7
Browse awards
$14K
Obligations · USAspending
Actions Mar '22
1
Contract awards · USAspending
—
SAM.gov award notices · 12 mo

Top agencies

By obligations · USAspending, all years

Top NAICS

By obligations · USAspending, all years

  • 325510 Paint and Coating Manufacturing$14K

Recent awards

Latest contract actions by start date · USAspending

AwardAgencyStartAmount
SPMYM322P8032Defense Logistics Agency03/16/2022$14K

Subcontracts received

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

$370K
Received · FY2025–FY2027
$370K
Received · all years
2
Subawards
1
Prime

Top primes

Prime contractorTotal
FIRELAKE CONSTRUCTION INC$370K

Most recent

  • 01/05/2026 FIRELAKE CONSTRUCTION, INC. · 1232SA25F0148 · Department of Agriculture (USDA)
    "INSTALL DIRECT DIGITAL CONTROLS AS PER PLANS AND SPECIFICATIONS. ECOSTRUXURE BUILDING OPERATIONS (EBO). DEMOLITION WORK ASSOCIATED WITH AHU-7 REMOVAL FOR REPLACEMENT. REMOVE EXISTING PNEUMATIC CONTROLS FOR THE AHU’S. REMOVE EXISTING PNEUMATIC SPACE THERMOSTATS FOR 41 REHEAT COILS. CAP OFF PNEUMATIC AIR MAINS WHICH SERVE THESE DEVICES. LOW VOLTAGE POWER AND CONTROL WIRING BY ETS. FURNISH BELIMO CONTROL VALVES & ACTUATORS FOR NEW AHU-7 PRE-HEAT COILS AND CHILLED WATER COILS. MC TO INSTALL VALVES, BELIMO G350B-N+AFB24-SR-X1, 2”, 3-WAY. FURNISH AND INSTALL DAMPER ACTUATORS FOR ALL DAMPERS ASSOCIATED WITH AHU-7. FURNISH AND INSTALL NEW CONTROLLERS AND 3-WAY CONTROL VALVES FOR 24 REHEAT COIL LOCATIONS. INCLUDES NEW SPACE TEMPERATURE SENSORS WITH LCD DISPLAY AND SETPOINT ADJUSTMENT. COORDINATE WITH BALANCING CONTRACTOR FOR CONTROL SOFTWARE ACCESS WHEN BALANCING THE SYSTEMS. ONE YEAR WARRANTY FOR WORK ASSOCIATED WITH THESE ITEMS."
    $180K
  • 07/31/2025 FIRELAKE CONSTRUCTION, INC. · 1232SA25F0148 · Department of Agriculture (USDA)
    "INSTALL DIRECT DIGITAL CONTROLS AS PER PLANS AND SPECIFICATIONS. ECOSTRUXURE BUILDING OPERATIONS (EBO). DEMOLITION WORK ASSOCIATED WITH AHU-7 REMOVAL FOR REPLACEMENT. REMOVE EXISTING PNEUMATIC CONTROLS FOR THE AHU’S. REMOVE EXISTING PNEUMATIC SPACE THERMOSTATS FOR 41 REHEAT COILS. CAP OFF PNEUMATIC AIR MAINS WHICH SERVE THESE DEVICES. LOW VOLTAGE POWER AND CONTROL WIRING BY ETS. FURNISH BELIMO CONTROL VALVES & ACTUATORS FOR NEW AHU-7 PRE-HEAT COILS AND CHILLED WATER COILS. MC TO INSTALL VALVES, BELIMO G350B-N+AFB24-SR-X1, 2”, 3-WAY. FURNISH AND INSTALL DAMPER ACTUATORS FOR ALL DAMPERS ASSOCIATED WITH AHU-7. FURNISH AND INSTALL NEW CONTROLLERS AND 3-WAY CONTROL VALVES FOR 24 REHEAT COIL LOCATIONS. INCLUDES NEW SPACE TEMPERATURE SENSORS WITH LCD DISPLAY AND SETPOINT ADJUSTMENT. COORDINATE WITH BALANCING CONTRACTOR FOR CONTROL SOFTWARE ACCESS WHEN BALANCING THE SYSTEMS. ONE YEAR WARRANTY FOR WORK ASSOCIATED WITH THESE ITEMS."
    $189K