ELECTRIC MOTOR AND CONTRACTING COMPANY
UEI: L35KPCL8NMN3
$9.0M
Obligations · USAspending
Actions Jan '13 – Apr '26
166
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Feb '27
Period of performance through
Top agencies
By obligations · USAspending, all years
- Department of Defense$8.6M · 134 awards
- Department of Homeland Security$248K · 29 awards
- Department of Transportation$118K · 2 awards
- U.S. Agency for Global Media$18K · 1 awards
Top NAICS
By obligations · USAspending, all years
- 335312 Motor and Generator Manufacturing$3.5M
- 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance$626K
- 333999 $527K
- 334511 Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing$478K
- 335931 Current-Carrying Wiring Device Manufacturing$462K
- 334220 Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing$457K
Recent awards
Latest contract actions by start date · USAspending
| Award | Agency | Start | Amount |
|---|---|---|---|
| N4215826P0012 | Department of the Navy | 04/13/2026 | $1K |
| N0010426PYC45 | Department of the Navy | 03/06/2026 | $110K |
| N0038326FDW00 | Department of the Navy | 10/16/2025 | $36K |
| N0038325FDW01 | Department of the Navy | 08/26/2025 | $216K |
| N0010425PCC06 | Department of the Navy | 08/26/2025 | $97K |
| N0038325PP229 | Department of the Navy | 08/18/2025 | $64K |
| N0010425PLC21 | Department of the Navy | 06/13/2025 | $222K |
| N0010425PCB57 | Department of the Navy | 05/27/2025 | $292K |
| N0010425PLB26 | Department of the Navy | 02/18/2025 | $205K |
| N0038325FDW00 | Department of the Navy | 01/22/2025 | $36K |
Expiring contracts
Period of performance ending in the next 18 months · USAspending
- N0038325FDW01 · Department of Defense$216K · ends 02/25/2027
- N0038326FDW00 · Department of Defense$36K · ends 11/27/2026
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$1.8M
Received · FY2025–FY2027
$1.8M
Received · all years
27
Subawards
6
Primes
Top primes
| Prime contractor | Total |
|---|---|
| MARINE HYDRAULICS INTERNATIONAL, LLC | $907K |
| EAST COAST REPAIR & FABRICATION, LLC | $280K |
| HUNTINGTON INGALLS INC | $260K |
| METRO MACHINE CORP. | $221K |
| QED SYSTEMS, INC. | $187K |
| BAE SYSTEMS MARITIME SOLUTIONS NORFOLK INC. | −$57K |
Most recent
- $50KFFP 2 OR MORE NON-COMMERCIAL
- $77KACCOMPLISH REQUIREMENTS ON THE USS BAINBRIDGE (DDG-96) SRA (3616-082) FOR WORK ITEM: 531-51-002 PARA 3.1-3.1.1, 3.4-3.4.2; 256-71-001 PARA 3.5-3.8, 3.12; 571-31-001 PARA 3.7-3.7.2, 3.8-3.8.2, 3.13, 3.4-3.7.4, 3.7.7, 3.7.12-3.12 OF 009-36; 583-11-001 PARA 3.4.7-3.4.7.2; 512-11-010 PARA 3.1.8; 541-22-001 PARA 3.11 PER THE ATTACHED QUOTE. POP: 08/17/2026 - 01/04/2027. ALL REQUIRED REFERENCES ARE LISTED IN PARAGRAPH 2 OF THE SPEC ITEM. ALL WORK TO BE ACCOMPLISHED IAW FY26. ECR POC: JAMES MILLER 757-355-0974 OR JMILLER@ECRFAB.COM.
- $55KFFP 2 OR MORE NON-COMMERCIAL
- $2KPERFROM VIB ANALYSIS & HYDRO TEST ISO #1A MAIN S/W COOLING PUMP AND MOTOR
- $11KREMOVE EXISTINGSTYLE C-CLIPS & INSTALL SINGLE USE CRIMP TYPE RETAINING X-CLIPS ENCLOSURE DOOR ON CONTROLLERS ACCOMPLISH 009-104 BORE & BUSH END-BELLS REPAIR EXHAUST FAN MOTOR
- $101KREFURBISH FOUR (4) LHD CLASS FORCED DRAFT BLOWER ATTACHED LUBE OIL PUMPS
- $40KRE-LUG ALL STATOR LEADS CONFORMING TO MIL-T-16366 IAW RCC 634G REMOVE EXISTING & INSTALL NEW PARTS TO AN AC VERTICAL MOUNT MOTOR & INVOKE 009-113 IAW RCC 454G INSTALL THERMOMETER, THERMOWELLS, & X-CLIPS IAW RCC 655G REPAIR THE COOLING PUMP MOTOR IAW RCC 685G
- $36KCHASE OUTPUT SHAFT THREADS REMOVE, MANUFACTURE AND INSTALL NEW, THE OUTPUT SHAFT FOUND TO BE UNSERVICEABLE FOR THE #2 PLUMBING WASTEWATER. PUMP MOTOR AND REATTACH THE FAN COVER ADDITIONAL LUBE OIL PURIFIER CONTROLLER REPAIRS ADDITIONAL MATL & REPAIRS ISO #6 & #7 HOW WATER HEATER CONTROLLERS PERFORM VIB ANALYSIS IAW 009-104 ISO BORE & BUSH ODE ENDBELL ONLY
- $85K*CO4* ACCOMPLISH REQUIREMENTS ON THE USS GUNSTON HALL (3593-118) ITEM 524-23-001 RCC57G; AND 521-11-001 RCC 60G (SUPPLY 1 MECHANICAL SEAL) PER ATTACHED QUOTE 00068333B. POP 3/2/25 - 03/13/26 ALL REQUIRED REFERENCES ARE LISTED IN PARAGRAPH 2 OF THE SPEC ITEM. ALL WORK TO BE ACCOMPLISHED IAW FY26. ECR POC KEN WILSON @ 757-342-5439
- $74KREPAIR GYPSY WINCH MOTOR BORE & BUSH OPPOSITE DRIVE END BELL BEARING FIT & MACHINE TO PROPER TOLERANCES. CHASE OUTPUT SHAFT THREADS ISO 1A & 1B PLUMBING WASTE WATER PUMPS & PROCURE & INSTALL NEW COOLING FAN FOR 1B BORE & BUSH OPPOSITE DRIVE END BELL BEARING FIT & MACHINE TO PROPER TOLERANCES. CHASE OUTPUT SHAFT THREADS ISO 2A PLUMBING WASTE WATER PUMP MOTOR BORE & BUSH OPPOSITE DRIVE END BELL BEARING FIT & MACHINE TO PROPER TOLERANCES. CHASE OUTPUT SHAFT THREADS ISO 2A & 2B CHT AIR ASPIRATOR PUMP MOTOR. PROCURE & INSTALL NEW COOLING FAN FOR 2A MACHINE POLISH THE OPPOSITE DRIVE END BEARING JOURNAL TO PROPER TOLERANCES. PROCURE & INSTALL NEW DRIVE END BEARING CAP ACCOMPLISH 009-113 ISO VANEAXIAL FAN REPLACEMENT ACCOMPLISH 009-17, 009-32 & 009-15 BORE & BUSH OPPOSITE DRIVE END BELL BEARING FIT & MACHINE TO PROPER TOLERANCES. CHASE OUTPUT SHAFT THREADS ISO 1A & 1B CHT AIR ASPIRATOR PUMP MOTOR ACCOMPLISH 009-17, 009-32 & 009-15