ENDURALOCK LLC
UEI: RYHNC43LN1U8CAGE: 7QJV4LENEXA, KS
$8.7M
Obligations · USAspending
Actions Feb '21 – Sep '26
13
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Mar '27
Period of performance through
Top agencies
By obligations · USAspending, all years
- Department of Defense$8.4M · 12 awards
- National Aeronautics and Space Administration$225K · 1 awards
Top NAICS
By obligations · USAspending, all years
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)$8.7M
Recent awards
Latest contract actions by start date · USAspending
| Award | Agency | Start | Amount |
|---|---|---|---|
| 80NSSC26C0237 SBIR PHASE I - UPGRADE MODULE USING ONELINK(TM) FOR SATELLITE SERVICING MISSIONS | National Aeronautics and Space Administration | 09/30/2026 | $225K |
| FA864925P0301 SATELLITE DOCKING SYSTEM WITH MECHANICAL LINKAGE, DATA AND POWER CONNECTION, AND FUEL TRANSFER | Department of the Air Force | 05/22/2025 | $1.2M |
| FA864923P1123 MECHANICALLY LOCKING, HIGH VIBRATION RESISTANT FUEL LINE CONNECTORS AND HYDRAULIC FITTINGS TO IMPROVE FLIGHT LINE MAINTENANCE TIMES ON THE B-1 AND B-2 BY ELIMINATING THE NEED FOR SAFETY WIRE | Department of the Air Force | 07/21/2024 | $1.2M |
| FA864924P0754 MECHANICALLY LOCKING, HIGH VIBRATION RESISTANT ELECTRICAL CONNECTORS TO ENABLE UNINTERRUPTED DATA TRANSMISSION | Department of the Air Force | 05/17/2024 | $75K |
| FA252124C0011 SEQUENTIAL PHASE II SMALL BUSINESS INNOVATION RESEARCH (SBIR) TACTICAL FUNDING INCREASE (TACFI) - SPACE-QUALIFIED ROBOTIC MANIPULATORS AND FASTENERS | Department of the Air Force | 04/01/2024 | $1.5M |
| FA864923P0235 MECHANICALLY LOCKING, HIGH VIBRATION RESISTANT FUEL LINE CONNECTORS | Department of the Air Force | 11/02/2022 | $75K |
| FA945322CA059 LATCHING AND FASTENING MECHANISM FOR ON-ORBIT SERVICING, ASSEMBLY, AND MANUFACTURING. | Department of the Air Force | 07/05/2022 | $250K |
| FA864922P0854 B-1, B-2 AND KC-135 FLIGHT LINE MAINTENANCE TIME REDUCTION VIA THE DEVELOPMENT OF ENDURALOCK FASTENERS, SELF-ALIGNING NUT PLATES, AND LOCKING V-BAND CLAMPS AS SUBSTITUTE COMPONENTS | Department of the Air Force | 05/06/2022 | $1.2M |
| FA864922P0897 B-1, B-2, AND KC-135 GROUND SUPPORT EQUIPMENT RELIABILITY IMPROVEMENT THROUGH THE DEVELOPMENT OF ENDURALOCK MECHANICALLY LOCKING, HIGH VIBRATION RESISTANT FASTENERS AS SUBSTITUTE COMPONENTS | Department of the Air Force | 05/02/2022 | $1.2M |
| FA864922P0810 MECHANICALLY LOCKING AND SELF-ALIGNING NUT PLATE THAT IS MAGNETICALLY UNLOCKED. | Department of the Air Force | 03/07/2022 | $749K |
Expiring contracts
Period of performance ending in the next 18 months · USAspending
- FA864925P0301 · Department of Defense$1.2M · ends 02/23/2027
- 80NSSC26C0237 · National Aeronautics and Space Administration$225K · ends 03/30/2027