EPOXY COATING SPECIALISTS, LLC
UEI: UF3ZXH52AV62
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$17K
Received · FY2025–FY2027
$17K
Received · all years
5
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| FIRELAKE-DIVERSIFIED JV2 LLC | $17K |
Most recent
- $22K"ABIDE G-002. • ABIDE TO GENERAL NOTES IN THE DRAWING SHEETS. • SHALL PREPARE SURFACE IN ACCORDANCE WITH MANUFACTURER INSTRUCTIONS UTILIZING SELF-CONTAINED GRINDING OR SHOTBLASTING. • PRE-FILL SURFACE IRREGULARITIES, JOINTS, HOLES, AND CRACKS. • APPLY RESINOUS FLOOR SYSTEM PER MANUFACTURER INSTRUCTIONS. • PERFORM CALCIUM CHLORIDE/RELATIVE HUMIDITY TESTS ON CONCRETE PER REQUIREMENT. • SCOPE OF WORK INCLUDES ROOM G3 (PESTICIDE), G4 (BIO ASSEMBLY), G10 (SEMI VOA GCMS 2), G11 (SEMI VOA GCMS 1), G15 (TCLP LAB), G16 (ORGANIC EXTRACTION), G16A (STORAGE), AND A1 (GLASS WASH)."
- $4KPERFORM EPOXY PATCHING FOR TO2
- −$25K"DEDUCT - FURNISH ALL LABOR, MATERIAL, EQUIPMENT, INSURANCE, AND SUPERVISION REQUIRED FOR INSTALLATION OF 3” INFILL IN ROOM 205 MICROBIOLOGY. MATERIALS TO BE USED AS PER REVISED SPECS 09 67 23 FROM 3/5/24. THIS SCOPE IS NO LONGER REQUIRED."
- $13K"1. HIGH MOISTURE PRE-PRIMER IN A-1, G3, G4, G6, G15, G16 & G16A 2. MOBILIZATION FOR A-1 3. TAXES ON MATERIALS"
- $3KAPPLY MOISTURE MITIGATION PRODUCT ON G-10 AND G-11 FLOORS.