FREESTATE BALTIMORE, LLC
UEI: ZDFAFLT9LJS9
$424K
Obligations · USAspending
Actions Feb '22 – Jan '24
4
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Top agencies
By obligations · USAspending, all years
- Department of Homeland Security$424K · 4 awards
Top NAICS
By obligations · USAspending, all years
Recent awards
Latest contract actions by start date · USAspending
| Award | Agency | Start | Amount |
|---|---|---|---|
| 70Z04024PYARD0001 | U.S. Coast Guard | 01/01/2024 | $124K |
| 70Z04023PYARD0001 | U.S. Coast Guard | 12/28/2022 | $166K |
| 70Z04022PYARD0003 | U.S. Coast Guard | 02/01/2022 | $133K |
| 70Z04022PYARD0001 | U.S. Coast Guard | 02/01/2022 | — |
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$3.0M
Received · FY2025–FY2027
$3.0M
Received · all years
1
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| STAMPEDE VENTURES, INC. | $3.0M |
Most recent
- $3.0M• ALL ELECTRICAL MODIFICATIONS IN ALL AREAS AFFECTED BY CONSTRUCTION ACTIVITIES TO COMPLETE THE WORK DESCRIBED IN THE SOW. • NEW PROGRAMMABLE LOGIC CONTROLLER GENERATOR PLANT CONTROL SYSTEM TO REPLACE THE EXISTING POWERCOMMAND DMC STATION. • NEW CONTAINERIZED MEDIUM-VOLTAGE RESISTIVE/REACTIVE LOAD BANK. BASIS OF DESIGN: AVTRON POWER SOLUTIONS 8000 SERIES. • CONNECTION OF THE LOAD BANK TO EXISTING FEEDER BREAKER IN THE OUTSIDE POWER PLANT (OPP) WEST MEDIUM VOLTAGE SWITCHGEAR. • REWORK OF THE EXISTING F1 AND F6 FEEDER CIRCUITS FROM THE MAIN EXTERIOR SWITCHGEAR TO ALLOW SWITCHING OPTIONS BETWEEN THE OPP EAST AND WEST SWITCHGEAR BUSES AND THE MAIN EXTERIOR UTILITY CIRCUITS. • TESTING OF ALL MV CIRCUIT BREAKERS AND RELAYS IN THE OPP EAST AND WEST SWITCHGEAR AS WELL AS THE MAIN EXTERIOR SWITCHGEAR. • ALL REQUIRED MODIFICATIONS TO THE EXISTING FIRE DETECTION AND ALARM SYSTEM IN ALL AREAS AFFECTED BY CONSTRUCTION ACTIVITIES. • MODIFICATION, RELOCATION, REMOVAL OR EXTENSION OF ANY CONDUIT OR PATHWAYS USED FOR EXISTING ACCESS CONTROL AND INTRUSION DETECTION SYSTEMS IN ALL AREAS AFFECTED BY CONSTRUCTION ACTIVITIES AS REQUIRED. • TESTING AND COMMISSIONING OF THE NEW SYSTEMS PRIOR TO ACCEPTANCE. • PAYMENT AND PERFORMANCE BONDS • OFF HOURS WORK AS NECESSARY TO ACCOMMODATE MEDIUM VOLTAGE WORK AND/OR MANHOLE WORK AS REQUIRED BY FREESTATE SAFETY PROTOCOL AND FACILITY OPERATIONS.