GS HYDRAULIC HOSE CORP
UEI: UBFKCD625UF3
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$2.0M
Received · FY2025–FY2027
$2.0M
Received · all years
12
Subawards
4
Primes
Top primes
| Prime contractor | Total |
|---|---|
| VIGOR MARINE LLC | $1.8M |
| BAE SYSTEMS TECHNOLOGY SOLUTIONS & SERVICES INC. | $67K |
| NATIONAL STEEL AND SHIPBUILDING COMPANY | $55K |
| DELPHINUS ENGINEERING, INC. | $53K |
Most recent
- $41KEXHAUST VENTILATION CLEANING AND BALANCING; ACCOMPLISH - SUPPLIER WILL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, SUPERVISION, QA AND ENGINEERING NECESSARY TO ACCOMPLISH THE REQUIREMENTS TO PROVIDE EXHAUST VENTILATION CLEANING AND BALANCING; ACCOMPLISH, PER VIGOR’S RFQ AND SUPPLIER’S PRICING PROPOSAL, IN ACCORDANCE WITH THE REQUIREMENTS SPECIFIED IN THE WORK ITEM AND THE ATTACHED USNS SAVANNAH FLOW DOWN CLAUSES. ALL APPROVED CHANGE ORDER WORK OUTSIDE OF BASE SCOPE TO BE NEGOTIATED AND AGREED UPON PRIOR TO CHANGE ORDER WORK STARTING.
- $67K06/16/2026 BAE SYSTEMS TECHNOLOGY SOLUTIONS & SERVICES INC. · FA252126F0064 · Department of Defense (DOD)REMOVE AND REPLACE 46 FLEX HOSES IX 536 BARGE
- $705K"REMOVE, FABRICATE, INSTALL HOSES WORK ITEM 234-10-001 - ENGINE ROOM 2 GAS TURBINE MODULE (GTM) FLEXIBLE HOSE ASSEMBLY; REPLACE PARAGRAPHS - 3.2 - 3.2.9"
- $393KREMOVE, MANUFACTURE, PRESSURE TEST & TAG, AND REINSTALL 172 HOSES - SUPPLIER WILL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TRAVEL, SUPERVISION, QA AND ENGINEERING NECESSARY TO ACCOMPLISH THE REQUIREMENTS TO PROVIDE REMOVE, MANUFACTURE, PRESSURE TEST & TAG, AND REINSTALL 172 HOSES, PER VIGOR’S RFQ AND SUPPLIER’S PRICING PROPOSAL, IN ACCORDANCE WITH THE REQUIREMENTS SPECIFIED IN THE WORK ITEM, AND THE ATTACHED USNS WASHINGTON CHAMBERS FLOW DOWN CLAUSES. ALL APPROVED CHANGE ORDER WORK OUTSIDE OF BASE SCOPE TO BE NEGOTIATED AND AGREED UPON PRIOR TO CHANGE ORDER WORK STARTING.
- $40KVACUUM, COLLECTION, HOLDING AND TRANSFER FLEX HOSE - WORK ITEM 593-11-004, RCC 386G - REPLACE (OPTION ITEM), REMOVE, TEMPLATE, MANUFACTURE, PRESSURE TEST, TAG AND REINSTALL 4EA VCHT FLEX HOSES.
- $53KINSTALLATION SERVICES
- $55KREPAIR SUB-CONTRACTS
- $71KREMOVAL OF HOSES, MANUFACTURING OF NEW HOSES, HYDROSTATIC TESTING, TAGGING, AND RE-INSTALLATION OF HOSES - SUPPLIER WILL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TRAVEL, SUPERVISION, QA AND ENGINEERING NECESSARY TO ACCOMPLISH THE REQUIREMENTS TO PROVIDE LABOR AND MATERIALS TO COMPLETE REMOVAL OF HOSES, MANUFACTURING OF NEW HOSES, HYDROSTATIC TESTING, TAGGING, AND RE-INSTALLATION OF HOSES, PER VIGOR’S RFQ AND SUPPLIER’S PRICING PROPOSAL, , IN ACCORDANCE WITH THE REQUIREMENTS SPECIFIED IN THE WORK ITEM, AND THE ATTACHED USNS JOHN MCCAIN FLOW DOWN CLAUSES. ALL APPROVED CHANGE ORDER WORK OUTSIDE OF BASE SCOPE TO BE NEGOTIATED AND AGREED UPON PRIOR TO CHANGE ORDER WORK STARTING.
- $234KFLEX HOSE REPLACEMENT AS REQUIRED - SUPPLIER WILL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TRAVEL, SUPERVISION, QA AND ENGINEERING NECESSARY TO ACCOMPLISH THE REQUIREMENTS TO PROVIDE LABOR AND MATERIALS TO COMPLETE FLEX HOSE REPLACEMENT AS REQUIRED, PER VIGOR’S RFQ AND SUPPLIER’S PRICING PROPOSAL, , IN ACCORDANCE WITH THE REQUIREMENTS SPECIFIED IN THE WORK ITEM, AND THE ATTACHED USNS JOHN MCCAIN FLOW DOWN CLAUSES. ALL APPROVED CHANGE ORDER WORK OUTSIDE OF BASE SCOPE TO BE NEGOTIATED AND AGREED UPON PRIOR TO CHANGE ORDER WORK STARTING.
- $234KREMOVE, DISASSEMBLE HOSES, INSPECT FITTINGS, CONFIRM SUITABILITY FOR RE-USE, MANUFACTURE NEW HOSES USING EXISTING FITTINGS AND NEW HOSE, HYDROSTATICALLY TEST AND TAG AND REINSTALL 88 FLEX HOSES - SUPPLIER WILL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TRAVEL, SUPERVISION, QA AND ENGINEERING NECESSARY TO ACCOMPLISH THE REQUIREMENTS TO PROVIDE LABOR AND MATERIALS TO COMPLETE REMOVE, MANUFACTURE, PRESSURE TEST & TAG, AND REINSTALL 88 HOSES, PER VIGOR’S RFQ AND SUPPLIER’S PRICING PROPOSAL, IN ACCORDANCE WITH THE REQUIREMENTS SPECIFIED IN THE WORK ITEM, AND THE ATTACHED USS JOHN MCCAIN DDG-95. ALL APPROVED CHANGE ORDER WORK OUTSIDE OF BASE SCOPE TO BE NEGOTIATED AND AGREED UPON PRIOR TO CHANGE ORDER WORK STARTING.