ICOR CONSTRUCTION LLC
UEI: HQDCKZ7LNHL8CAGE: 82TU2HAMPTON, AR
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$3.4M
Received · FY2025–FY2027
$3.4M
Received · all years
24
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| GENERAL DYNAMICS-OTS, INC. | $3.4M |
Most recent
- $297KPLANT 1 B47 CRUSHER BAY CONTROL ROOM
- $403KB47 EXHAUST FANS FOR CHILLER/HEATER ROOM
- $112KB47 COOLING TUNNEL #1 & #2 MISTER PIPING
- $78KMOD PO 111543 FOR REMAINING 20% ON B47 COOLING TUNNEL ELEC
- $148KMOD PO 111472 - REMAINING 20% - B47 MOD FOR MORE SQ FT
- $81KICOR 200 DEG OVEN PREHEAT REQ'MNT
- $79KB47 AIR LOCKS - LABOR COSTS; B47 AIR LOCKS - MATERIAL COSTS; B47 AIR LOCKS - EQUIPMENT FEES
- $76K101725-SI-01 B47 BASE ANGLE FOR WALL PROTECTION, 101725-SI-02 B47 ADD'L GROUNDING COOLING TUNNEL/EQUIP;101725-SI-03 B47 FORK LIFT CHARGERS POWER (2);101725-SI-04 B47 BAND CLIPPER POWER;101725-SI-05 B47 INDICATOR WARNING LIGHTS (3);101725-SI-06 B47 ADD'L LIGHTS LOADING DOCK RELOCATED;101725-SI-07 B47 CONDENSATE PIPING/PUMP/TANK, ELECTRICAL
- $57KB45 CONDUCTIVE FLOOR REPAIR WORK
- $78KB47 ADD'L BACK FILL LABOR HOURS, B47 ADD'L BACK FILL - MATERIAL COSTS, B47 ADD'L BACK FILL - EQUIPMENT COSTS