INTERNATIONAL FLOORING & PROTECTIVE COATINGS INC
UEI: UZGNVGQVER16
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$6.1M
Received · FY2025–FY2027
$6.1M
Received · all years
13
Subawards
5
Primes
Top primes
| Prime contractor | Total |
|---|---|
| BAE SYSTEMS MARITIME SOLUTIONS NORFOLK INC. | $2.9M |
| SCIENTIFIC RESEARCH CORPORATION | $1.0M |
| METRO MACHINE CORP. | $998K |
| EAST COAST REPAIR & FABRICATION, LLC | $738K |
| QED SYSTEMS, INC. | $369K |
Most recent
- $2.9MDIRECT SUBCONTRACT COSTS 01/27/25_$3,155,842_C/O-00 03/28/25_$41,993_C/O-01 10/07/25_$118,000_C/O-02 10/17/25_<$551,515>_C/O-03 10/29/25_<$9856>_C/O-04 11/21/25_$626,378_C/O-05 03/25/26_<$466,322>_C/O-06 03/25/26_<$75,861>_C/O-07 04/22/26_$119,500_C/O-08 06/12/26_<$32,183>_C/O-09 07/22/26_$15,400_C/O-10
- $256KFFP 2 OR MORE NON-COMMERCIAL
- $212K1. LAND BASED STORAGE AND INSIDE STORAGE OF 40WB0704 2. LAND BASED STORAGE AND INSIDE STORAGE OF 40WB0704 WORKBOAT / HOUSE AND NON-SKID / UW HULL BOARD FREEBOARD AND FLEETING
- $50K*CO3* ACCOMPLISH REQUIREMENTS ON THE USS GRAVELY (DDG-107) SRA (3576-094) FOR WORK ITEM: 643-11-001 PARA 3.6 - 3.7.1; AND 644-11-001 PARA 3.12 - 3.13 IAW THE ATTACHED QUOTE. POP: 01/12/2026 €“ 10/12/2026. ALL REQUIRED REFERENCES ARE LISTED IN PARAGRAPH 2 OF THE SPEC ITEM. ALL WORK TO BE ACCOMPLISHED IAW FY26. ECR POC: DIEGO GUTIERREZ 757-769-1180 OR DGUTIERREZ@ECRFAB.COM.
- $210K1. LAND BASED STORAGE AND INSIDE STORAGE OF 30FT 2. LAND BASED STORAGE AND INSIDE STORAGE OF 30FT WORKBOAT / HOUSE AND NONSKID / UW BOARD FREEBOARD AND FLEETING.
- $113K*CO1* PROVIDE LABOR, SUPERVISION, MATERIALS AND SAFETY TO ACCOMPLISH REQUIREMENTS ON THE USS GRAVELY (DDG-107) SRA FOR WORK ITEM: 634-11-009 (A1) PARA 3.1 - 3.2; 634-11-010 (A1) PARA 3.1 - 3.2; 634-11-011 (A1) PARA 3.1 - 3.2; 634-11-012 (A1) PARA 3.1 - 3.2; 634-11-013 (A1) PARA 3.1 - 3.2; 634-11-014 (A1) PARA 3.1 - 3.2; 634-11-015 (A1) PARA 3.1 - 3.2 AND 634-11-016 (A1) PARA 3.1 - 3.2. POP: 01/12/2026 – 10/12/2026. ALL REQUIRED REFERENCES ARE LISTED IN PARAGRAPH 2 OF THE SPEC ITEM. ALL WORK TO BE ACCOMPLISHED IAW FY26. ECR POC: DIEGO GUTIERREZ 757-769-1180 OR DGUTIERREZ@ECRFAB.COM.
- $49KTO PROVIDE LABOR, SUPERVISION, MATERIALS AND SAFETY TO ACCOMPLISH REQUIREMENTS ON THE USS GUNSTON HALL (3593-014) ITEM 644-11-002 FOR PARA 3.13 - 3.13.1, 009-26 AS REQUIRED PER ATTACHED QUOTE, FFP: $48,518.00 POP 12/15/25 - 04/03/26 ALL REQUIRED REFERENCES ARE LISTED IN PARAGRAPH 2 OF THE SPEC ITEM. ALL WORK TO BE ACCOMPLISHED IAW FY26. ECR POC: KEN WILSON 757-342-5439 OR KAWILSON@ECRFAB.COM
- $527KTO PROVIDE LABOR, SUPERVISION, MATERIALS AND SAFETY TO ACCOMPLISH REQUIREMENTS ONBOARD THE USS GRAVELY WORK ITEM: 634-11-002 PARA 3.2; 634-11-003, PARA 3.2-3.2.1; 634-11-004, PARA 3.2-3.2.1; 634-11-005, PARA 3.2-3.2.1; 634-11-006, PARA 3.1-3.2.2; 634-11-007, PARA 3.2-3.2.1; 634-11-008, PARA 3.3; 634-21-001, PARA 3.3-3.4, 3.11- 3.11.2.1, 3.14; AND 634-21-002, PARA 3.4, 3.6, 3.9- 3.12, 3.16 . PERIOD OF PERFORMANCE IS 1/12/2026 TO 09/11/2026. ALL REQUIRED REFERENCES ARE LISTED IN PARAGRAPH 2 OF THE SPEC ITEM. IAW THE ATTACHED QUOTE DATED OCTOBER 29, 2025. ALL WORK TO BE ACCOMPLISHED WITHIN FY26. ECR POC: DION WIGFALL 757-813-0723 OR DWIGFALL@ECRFAB.COM
- $2KADDITIONAL WORK ON THE 30WB1701. ADD AN ADDITIONAL COMPLETE COAT OF PRIMER TO THE SUPER STRUCTURE.
- $49KPROVIDE SERVICES TO PAINT THE HULL, DECK, FREE BOARD AND APPLY NON-SKID TO 30WB1701 AND TO INCLUDE I-BEAM RENTAL ON 30WB1701.